EUI for LEED projectsCS-2009 EAp2: Minimum Energy Performanceposted by Ron Dean on Apr 19, 2013, 3:52 pm
Please, I would like to know where I can find the Energy Use Intensity (EUI) factors for LEED projects, according to their climate zone (per ASHRAE) and their activity. I've found EUI data for... Last reply: Ron Dean, Apr 26, 2013, 5:56 pm |
|
high savings in auxillary powerCS-2009 EAp2: Minimum Energy Performanceposted by shashank jain on Apr 19, 2013, 6:56 am
Hi we are modelling a 18 storey office block in Sap Paulo and getting some results we wanted to cross check, as we doing the energy model for the first time... Description of the... Last reply: Marcus Sheffer, Apr 19, 2013, 10:39 am |
|
Energy Model for building with under floor air distributionCS-2009 EAp2: Minimum Energy Performanceposted by farhana imran on Apr 16, 2013, 3:37 am
We are working on a business tower with 2B+G+ 27+Roof floors. The tower has raised floor with UFAD/TDV systems from ground floor to 27th floors except toilets areas in each floor. All fresh air... Last reply: Marcus Sheffer, Apr 16, 2013, 9:42 am |
|
Energy Modeling for a Group CertificationCS-2009 EAp2: Minimum Energy Performanceposted by Susan Di Giulio on Apr 8, 2013, 7:05 pm
We are working on an open-air shopping mall with 6 buildings arranged around a main "street". Some are attached and some aren't. There is also a parking... Last reply: Marcus Sheffer, Apr 9, 2013, 10:20 am |
|
Core&Shell Process Load on a Manufacturing FacilityCS-2009 EAp2: Minimum Energy Performanceposted by Lourdes Salinas on Apr 4, 2013, 9:21 am
Hi everyone, Last reply: Marcus Sheffer, Apr 4, 2013, 10:05 am |
|
typical floor v/s whole building simulationCS-2009 EAp2: Minimum Energy Performanceposted by shashank jain on Apr 2, 2013, 6:40 am
Hi we are doing the eap2 modelling for a 18 floor office building. the floors are all the same. can we model... Last reply: Marcus Sheffer, Apr 2, 2013, 9:12 am |
|
Automated Demand ResponseCS-2009 EAp2: Minimum Energy Performanceposted by Ryan McEvoy on Mar 29, 2013, 2:32 pm
We are working on a project that is participating in automated... Last reply: Marcus Sheffer, Mar 31, 2013, 8:09 pm |
|
ASHRAE mandatory provisionsCS-2009 EAp2: Minimum Energy Performanceposted by Anna Korinkova on Mar 25, 2013, 10:18 am
I guess that it is a repetitive question but I need to be sure. Last reply: Marcus Sheffer, Mar 31, 2013, 8:06 pm |
|
ENERGY MODELINGCS-2009 EAp2: Minimum Energy Performanceposted by RICARDO GUEMEZ DIAZ on Mar 25, 2013, 9:52 pm
Hello, In Mexico City we have a one project that is integrated in two phases, the phase one start the construction phase in 2011 and the second phase will start the construction phase the next... |
|
Green WallCS-2009 EAp2: Minimum Energy Performanceposted by Yoyo Shek on Mar 12, 2013, 11:51 pm
Does anyone have idea if we could model the benefit of using green wall (Vegetated)? Last reply: Yoyo Shek, Mar 19, 2013, 12:06 am |