Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Material Cost - whats included .. whats not?

NC-2009 MRc5:Regional Materials
posted by  Jaida Anderson-Lozano  on 

The Reference Guide states "materials costs should account for all taxes and transportation costs incurred by the contractor but exclude any cost for labor and equipment once the material has been

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Wed Apr 30, 2014, 10:33 pm

Using the "Offline Calculator" option on LEEDOnline

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Maya Karkour  on 

Dear All, I am using the "Offline Calculator" option to upload the 62MZCalc on LEEDOnline. I noticed an input box requiring a narrative: "For projects using ASHRAE 62.1-2007, provide a narrative

5
Chief Engineer
Lile Engineering, LLC
LEEDuser Basic Member
59 thumbs up
Wed Apr 30, 2014, 9:32 pm

We got a review from a

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Marcio Alberto Casado Pereira  on 

We got a review from a Project and there are 2 comments that we are concerned about: 1) The review team says "that corridors, storage spaces, and technical rooms with intermitente occupancy would

9
Default Avatar
ZeroEnergy Design
LEEDuser Basic Member
0 thumbs up
Wed Apr 30, 2014, 7:21 pm
7
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Wed Apr 30, 2014, 3:31 pm

Modelling Basement Parking

NC-2009 EAp2:Minimum Energy Performance
posted by  Omar Elrawy  on 

I'am modelling a building with 2 levels of underground parking, which is unconditioned, opened to the outdoor, and having 4 fans (2 supply and 2 exhaust), while the exhaust fans are DCV's based on

9
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Wed Apr 30, 2014, 1:37 pm

Open space/ LEED boundary

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Tammy Dalton  on 

I am working on a project that is part of a leasehold located within an executive airport property.

2
Wed Apr 30, 2014, 11:29 am
4
President
Green Sage Consulting LLC
LEEDuser Premium Member
8 thumbs up
Tue Apr 29, 2014, 11:41 pm

Community Connectivity - Campus Services

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Shannon Terrell  on 

In the review process for our project. We have received teh following comment: "It is unclear whether all of the community services are available to the general public.

4
Default Avatar
Architect, LEED Consultant
Polk Stanley Wilcox Architects
LEEDuser Basic Member
29 thumbs up
Tue Apr 29, 2014, 9:14 pm

Temporary vs. Permanent Power

NC-2009 MPR6:Must commit to sharing whole-building energy and water usage data
posted by  Donald Green  on 

I posted this under MPR2 but thought I might get a response under this MPR as well... We have a project that may not have its permanent power for as long as a year after occupancy.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Tue Apr 29, 2014, 8:00 pm

IEQc3.2 Option 2: Air Testing

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Christopher Strunk  on 

Currently doing a LEED v.2009 project and are looking to pursue IEQc3.2, Option 2. We got a question from the air quality tester asking about the specific requirements for testing.

2
Default Avatar
LEED AP (O+M)
4 Elements Group
LEEDuser Basic Member
34 thumbs up
Tue Apr 29, 2014, 7:11 pm