Does 10-4 Mandatory provision apply for process electric motors?
NC-2009 EAp2:Minimum Energy Performanceposted by Valentin Grimaud on
Dear community, I would like clarifications about the scope covered by the section 10-4 of the ashrae 90.1-2007: in an industrial project, there may be lots of electric motors related to the indu
European Project with LEED v4 strategy
NC-2009 MRc2:Construction Waste Managementposted by Jaida Anderson-Lozano on
We have a project in Europe and like many other projects in Europe we are incinerating majority of our construction waste for energy reuse.
Submeter Installation for Data Center in Office Building
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by devin saylor on
We are experiencing problems with an office building that has a data center. We cannot find a subcontractor that is willing to install submeters on the power output (instead of input).
Sharing "designated" exhaust systems
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Iris Amdur on
Can a project provide one shared exhaust system for two hazardous gas/chemical use areas? Or to comply with the term "designated" does each space needs its own exhaust system?
Breathing Zone definition
NC-2009 IEQp1:Minimum IAQ Performanceposted by Gabriel Moreno on
Hello everyone, I'm confused by a substantial discrepancy between two different definitions that I have come across in regards to Breathing Zone. 1) LEED Definition: "The breathing zone is the re
date stamped photos
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Mike Decoster on
LEED online requests the following: Provide date-stamped photos showing the measures taken, including any corrective action, to effectively implement the ESC plan.
Not clear on what is new here
posted by Melissa Wrolstad on
After reading the article above, I am not sure what is new here.
Roofing Adhesives, Sealants & Mastics
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Catherine Blakemore on
I am reviewing a LEED submittal for roofing adhesives, sealants and mastics. 1. I am unsure of the categories each primer. Can you help? 2.
VRF HVAC Compliance
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Ben Thompson on
We are using a VRF HVAC System at a PK-8 School in Alexandria.
Shading by building and trees
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Terry Jordahl on
To come up with an area of shaded parking, etc, do I just add up the totals of my 10AM Noon and 3PM shadings by trees and buildings?