LEED Project Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Rezkar Abdulmajeed on
Can someone help me with this please?. I am working now in a health care LEED Project. The LEED Boundary was set already when we submitted the MPR.
MRc4 - Recycle Content of Reinforcement Steel
NC-2009 MRc4:Recycled contentposted by Keerthi Ratnayake on
How can we use the reinforcement steel towards this credit? Generally, suppliers do not have any information. Can we count 50% straightaway? Thanks
Stormwater rate and quantity calculation for case 1
NC-2009 SSc6.1:Stormwater design - quantity controlposted by sona prajapati on
Dear all, We have found a sample calculation to determine storm water rate and quantity for 1 yr-24 hr design storm and 2 yr-24 hr design storm from www.illinoisfloods.org/.../4D_Stormwater%20Volum
90% of average annual runoff
NC-2009 SSc6.2:Stormwater design - quality controlposted by Jamison Hill on
Is that the pre-development runoff rate or post-development runoff rate?
LEED NC 2009 for factory buildings
NC-2009 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
The project is a manufacturing facility with ancillary buildings such as admin, health centre, canteen, utility and security blocks. The buildings are not physically connected to each other.
GREENGUARD Gold (formerly Children & Schools), CA 01350, CARB II
NC-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber productsposted by Linda Davisson on
Since LEED-S projects can use NAUF compliance in place of CA 01350, can a NC or CI project use CA 01350 compliance or GREENGUARD Gold (formerly children & Schools) or CARB II in place of NAUF?
Energy Modeling for Casino
NC-2009 EAp2:Minimum energy performanceposted by Chris Hammett on
Hello. I am working on the energy model for a casino/hotel/nightclub. I have been contracted only to develop the model, no input in regards to design.
Post occupancy installation of photovoltaics as an appeal
NC-2009 EAc2:On-site renewable energyposted by Kris Phillips on
We have a project that may be 1 point short of the next level certification after its Construction Final Review and we have been asked to look at options to add a credit or two as an "appeal" to re
HVAC system's capability to accommodate CO2 sensors
CS-2009 IEQc1:Outdoor air delivery monitoringposted by CT G on
We are working in a CS project without any densely occupied spaces. The project contains VRF units to condition spaces and one fan supplies outdoor air to these units.