Forum quick links
certification of an airprt's Terminal
posted by Evangelia Mertziou on
Is it achievable the LT Credit "Surrounding Density and Diverse Uses", Option2 for the certification of an airport's Terminal?
LEED V4.1 EBO+M Minimum Program Requirements
posted by Ben McEwen on
I cannot verify that LEED V4.1 EBO+M requires fulfillment of the usual MPRs that have been required for previous versions (permanent location, site boundaries, etc.). V4 do
Gray water for irrigation
posted by Hoda Ibrahim on
Our project have external gray water for irrigation so we don’t have to treat water on site
Can I consider option 2 for 100% reduction or not?
Location and Transportation - option 2: Diverse uses
posted by Ricardo Filho on
Hi all;
I have a question on the Location and Transportation credit, more specifically on the topic of the Diverse use:
the User guide says:
Water Efficiency in CS
posted by Susan Di Giulio on
We are doing a large LEED-CS office building. The owner will provide 2 large restrooms with extremely low water fixtures for tenant employees on each floor.
Water splashing into my freezer with no ice maker.
posted by GeorgeMendes GeorgeMendes on
My ice maker was not making ice. Despite turning it off, water still flowed into my freezer causing a mess.
CI v4.1 BPDO-EPD credit - Exemplary Performance point for 20 EPDs?
posted by Renee Shirey on
For an NC/CI v4 project an Exemplary Performance point can be earned if the 20 EPD threshold is doubled to 40. Substitution of CI v4.1 PDO-EPD credit drops the EPD count to 10. So, if w
Defining the baseline for the LCA credit
posted by Nihar Pathak on
Hello,
So my question is about the baseline that needs to be defined for the LCA credit under v4.1.
Single Family Homes, MR Credit: Environmentally Preferred Products - Local Production
posted by Walter Broner on
Apologies if this has been answered already.
Option 1 has a 50% threshold for each building component that could meet the criteria.
Credit: Grid Harmonization
posted by Stephan Zweig on
Dear Leed User,
I have a question about the Grid Harmonization Credit:
If there is no Demand Response program available could I choose for my project Case 3?