LEED Project Submittal Tips from GBCI Review Teams
posted by Elizabeth Thompson on
An updated version of the LEED Project Submittal Tips is now live on the GBCI website, here: http://www.gbci.org/main-nav/building-certification/resources.aspx#tips.
Design Appeal and Construction Submittal
posted by J Morrison on
We had run into the issue that before we accepted the Design appeal we could not upload anything to our project site.
Appeals
posted by J Morrison on
Is there a limit to the number of appeals? The cost is so much per credit on appeals if I understand correctly?
Retracting Appeal
posted by Mark Krejcarek on
Does anyone know if it is possible to retract an appeal?
Strategy changes after construction review
posted by Michael Smithing on
1.
Additional space during the final design appeal
posted by Katherine Ann Resurreccion on
Our CI project is a 4-floor office space located in a 10-floor commercial building. We used the split-review option and are currently working with the Final Design Appeal.
Reviewer Error
posted by Daniel McDonald on
We have received review comments on MR4 that indicate the review team misread or mistyped something.
v2009 NC Split Review
posted by Francisco Villela on
I have just submitted Design Preliminary Review for my project.
Design Application Decision - 1 Denied Credit
posted by Joseph Greene on
We received our design application decision and 1 credit was denied. We noticed this was due to a simple documentation error which can be easily corrected.
Prerequisite Post Appeal Denial Options
posted by John Chyz on
Our project team erroneously missed a small outside air louver that was within the 25 ft. threshold for designated smoking areas.