Forum quick links
Re:Regional Priority Credit
posted by David Posada on
I had to look for it, too - In the v3 LEEDOnline scorecard, the fourth column is labeled "RP" at the top and a magnifying glass icon appears next to the regional priority credits based on the zip c
IP Credit: Discovery
posted by Mark Campbell on
This credit is a very good addition. A lot of LEED projects today aren't doing these types of studies and they are very valuable. Consider associating a time frame for this credit.
IP Credit: Implementing Synergies
posted by Mark Campbell on
This credit should be required to be documented in fundamental commissioning Basis of Design document.
EA Credit: Optimize Energy Performance
posted by Mark Campbell on
Add a process chart to explain the simulations that have to be performed, the time they have to be performed in design, and if they can be used to satisfy IPc1 - Discovery.
PF: Fundamental Commissioning & Verification
posted by Mark Campbell on
The layout of commissioning is based around design-bid-build model and not an integrative design or design-build delivery. This creates either a loophole or exception for achieving the prereq.
PF Credit: Enhanced Commissioning
posted by Mark Campbell on
Review contractor submittals and witness training should be in fundamental commissioning, then enhanced focuses on O&M and ongoing.
LEED 2012 Comments
posted by Jeff Chapman on
SS Prerequisite: Construction Activity Pollution Prevention: I would like to see a picture requirement to prove this plan was in place. SS Credit: Site Assessment : I am assuming that if this is
LEED 2012 Credit Comments
posted by Jeff Chapman on
SS Credit: Site Development— Open Space : I like the changes to this credit, it makes it easier to understand and implement to achieve the credits intent.
LEED 2012 Comments
posted by Jeff Chapman on
Prerequisite: Landscape - Good move to making this a pre-requisite. Good move moving the establishment period to 2 years. Good job moving the peak watering month to being site specific.
PF Credit: Monitoring Based Commissioning
posted by Mark Campbell on
This is a fantastic credit. Really focuses on ongoing performance optimization.