Add a process chart to explain the simulations that have to be performed, the time they have to be performed in design, and if they can be used to satisfy IPc1 - Discovery. It's not clear if from this wording if the two credits can be tied together.
The energy target by schematic design is a good thing.
Consideration of design-build projects should be addressed somewhere in LEED to clarify required timelines, otherwise there is a large loop hole there. Most contractors consider design-build integrative delivery.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.