Forum quick links
is drywall not considered a product for LEED V4?
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Sara BENLOUBA on
Hello Dears,
Is plasterboard / Drywall not considered a product for LEED V4 ?
This is what I understood from the LEED guide, page 469,
Minimum Air Requirement
EBOM-v4.1 EQp1:Minimum Indoor Air Qualityposted by Pulak Goyal on
I have an interior space going for LEED O+M v4.1 Interiors. The building is very old and the drawings of 1 out of 4 floors is not available.
Can LEED V3 or LEED V2009 professionals satisfy LEED Innovation requirements for LEED AP with a specialty on Innovation?
NC-v4.1 INc2:LEED Accredited Professionalposted by SIDDHARTH BHAT on
Hi,
Can someone guide me on whether a LEED V3 professional can satisfy LEED innovation requirements for LEED AP with a speciality on Innovation credit?
Kindly guide.
An EPD report but not yet published
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Dina El-Sady on
Does the product have to be published on EPD directory to be accepetd by LEED ?Is it enough to submit an EPD report with internal audit ?
O&M and Cx Plans as submittal requirements
Pilot-Credits INpc155:Design for Indoor Air Quality and Infection Controlposted by Maureen Drullard on
I'm curious what folks think about the submittal requirement to provide Cx and O&M plans to support this pilot credit?
Monitoring NOT req if ventilation systems are not within scope of work?
CI-v4 EQp1:Minimum indoor air quality performanceposted by RDK E&S on
I'm wondering if my understanding of the ID+C reference manual (pg 311) is correct: no airflow monitoring equipment is needed if the ventilation system isn't in the scope of work?
Fresh Air Requirement for Lift Lobbies: Transfer Air Consideration
NC-v4 EQp1:Minimum indoor air quality performanceposted by Subhashkumar A on
Hello,
Green Cleaning & COVID-19 Green Cleaning
Pilot-Credits INpc137:Cleaning and Disinfecting Your Space for Emerging Pathogensposted by CodeGreen Solutions on
This innovation credit requires the development of a COVID-19 focused green cleaning policy. Due to the uncertain and evolving nature of the COVID-19 virus, our project team isn't sure if
Can New Construction project use requirement of Warehouse and Distribution center to count point?
NC-v4 LTc4:Surrounding density and diverse usesposted by Michael on
Hi LEED expert, my project is a manufacturing plant with a warehouse. The warehouse accounts for 46% of the total GFA. The project will be registered under New Construction.
Split System AC in an existing building
NC-v4 EAc6:Enhanced refrigerant managementposted by Charles Marshall on
We are working on a major renovation project that contains several split system AC units which will be replaced. The owner doesn't have any record of the refrigerant volume that was charged f