Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Bar Space

CI-v4 EQc9:Acoustic performance
posted by  Kevin Gilleran  on 

Hi. We are working on a TI within a shell building which will have a bar, seating, lounge area, kitchen prep areas with support spaces and its own restrooms. No office function etc.

2
Partner
Longman Lindsey
LEEDuser Expert
6 thumbs up
Fri Aug 24, 2018, 5:59 pm

Flush out option -1 for spaces like Stairwells and Elevator shafts

NC-v4 EQc4:Indoor air quality assessment
posted by  Nishank Shah  on 

According to the language used in this credit, we are supposed to perform a building flush-out of the gross floor area.

0

Energy Star Equivalent

Retail-CI-v4 EAp2:Minimum energy performance
posted by  Luiza Junqueira  on 

Hello,

How do I find out if my local energy label (Selo Procel) is equivalent to energy star?

1
Fri Aug 24, 2018, 5:44 pm

Walk Off Mats in classrooms with exterior doors

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  TODD REED  on 

In the past we have just placed a typical walk off mat at the door in classrooms that have exterior doors. These are typical kindergarten classrooms that empty right onto the playground.

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Aug 23, 2018, 9:00 pm
3
Sustainable Design Specialist
FXCollaborative
LEEDuser Basic Member
0 thumbs up
Thu Aug 23, 2018, 7:25 pm

Emergency Generator

NC-2009 PIf2:Project Summary Details
posted by  Nicole Kimoto  on 

In our new facility we have an emergency generator that runs on diesel.

4
Thu Aug 23, 2018, 3:28 pm

Shaftliners in interior wall assemblies

NC-v4 EQc2:Low-emitting materials
posted by  Vandita Mudgal  on 

Do Shaftliners in the interior wall assemblies fall under the Low-Emitting Material category for CDPH v1.1 2010 VOC Emission testing?

0