Forum quick links
CDPH v1.2 (2017)
NC-v4 EQc2:Low-emitting materialsposted by Kristen Magnuson on
Does the USGBC accept products that have been tested for emissions in accordance with CDPH v1.2 (2017) for compliance with the low-emitting materials credit?
Envelope Cx - whole-building air leakage testing
NC-v4 EAc1:Enhanced commissioningposted by Julien Richard on
Is it acceptable if the air leakage testing is done by a subcontractor of the general contractor when all the other aspect of the envelope commissioning are done by an independant CxA ?
Primer and Top Coating for Carbon Steel Piping (Sprinkler System)
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Mustafa Kucukaslan on
I am working on a new construction for Healthcare facility as MEP Subcontractor which will apply for LEED Gold.
Emergency fire ventilation fans (motors) - Section 10.4.1
NC-v4 EAp2:Minimum energy performanceposted by Luis Andrade on
Hi,
Campus project - joint ESC plan and measures
NC-2009 SSp1:Construction activity pollution preventionposted by Melinda Orova on
Hi, We have a Campus project with 1 existing LEED certified building and 2 new buildings to be constructed on a Mastersite that is owned and operated by one company.
Pilot Credit 87 – Verified Construction & Demolition Recycling Rates
CI-v4 INc1:Innovationposted by Bonny Gray on
We have submitted for Pilot Credit 87 - Verified Construction & Demolition Recycling Rates. We received the following comments:
Provide the following:
Showers and Changing Rooms
CS-2009 SSc4.2:Alternative transportation - bicycle storage and changing roomsposted by Ernst Schriefl on
Hallo,
i have a question:
Stormwater Management in a project without pre-existing infrastructure
NC-v4 SSp1:Construction activity pollution preventionposted by Amine Zeidane on
Hello,
I'm working on a mixed-use tower construction project in Morocco.
LEED v4 Low Emitting Materials - Consistancy with testing methods
CS-v4 EQc2:Low-emitting materialsposted by Estra Marku on
Do all of the adhesive/sealant products used on our LEED v4 cs project need to be consistent with one testing method?