Forum quick links
Flush-out in phases
CI-v4 EQc4:Indoor air quality assessmentposted by Roshni Mathur on
We are working on a project wherein the interior fit-out work will be carried out in 2 phases. Consequtively the occupancy will be in 2 phases aswell.
Request for Clarification - Pre-Consumer Recycled Content, LEED v4.0/v4.1
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by HMTX Industries on
Greetings!
EDP documents
Pilot-Credits MRpc103:Integrative Analysis of Building Materialsposted by David Dixon on
working on documentation for the credit I am finding that the documentation in EDPs do not translate to the credit matrix and documenting is not smooth
One Greenguard Certificate for the same product marketed by Multiple Companies?
NC-v4.1 EQc2:Low-Emitting Materialsposted by Tiffany Beffel on
Our project used Shaw 4151 LVT Universal Adhesive. Shaw Contract literature makes claim to a Greenguard Certificate that is for the same 4151 universal adhesive, however, the certificate refe
PV system energy going directly to the grid
NC-v4 EAc2:Optimize energy performanceposted by Camilo Velez on
Good afternoon everyone,
Equipments to be Commissioned for Fundamental Commissioning
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Daisuke Miura on
Hi, I have a question regarding the scope of equipments to be commissioned for Fundamental Commissioning.
Definition of Informal Transit
NC-v4 LTc5:Access to quality transitposted by Michelle Rosenberger on
What is the definition of informal transit that is referenced in v4 Step 2 guidance?
IAQ testing credit substitution backwards from 4.1 to 4.0?
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
Hi all,
Switching Options Post-Preliminary Design Review
NC-v4 LTc4:Surrounding density and diverse usesposted by Darrah Jakab on
We are pursuing Option 2 and received comments in the preliminary design review that makes this option not tenable, but we believe we can achieve Option 1.