Forum quick links
Exemplary Performance
CS-v4 EAc2:Optimize energy performanceposted by Maria Porter on
Is the Exemplary Performance threshold 54 % for CS as well (like NC?) The leap seems bigger for CS project than for NC Projects, based on that the table ends on 47 % for CS and 50 % for NC, both ac
Energy model as per ASHRAE 90.1-2013
Retail-NC-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings,
We art to prepare an energy model for a project, which should be in accordance with ASHRAE 90.1-2013.
Compliance Strategies and Successes
Pilot-Credits MRpc102:Legal Woodposted by Chris Pyle on
Hi all!
Baseline building: daylight controls
NC-v4 EAp2:Minimum energy performanceposted by Ricardo Sá on
Hi,
my question is related with the need to consider (or not) daylight controls in baseline building. Table G3.1 (bullet 6) from ASHRAE 90.1-2010 states the following:
Hand held Devices for measuring TVOC
NC-v4.1 EQc4:Indoor Air Quality Assessmentposted by frederick muscatello on
Does anyone have any hand held meters for measuring TVOC they would recommend?
Purchasing Lamps Calculator
EBOM-v4 MRc2:Purchasing - lampsposted by Jorge Lopez de Obeso on
Hi, I used the current calculator that is on this site but I found out it goes to the max mercury content per bulb instead of the average of the building.
Clarify requirement for design review prior to 50% CDs
NC-v4.1 EAp1:Fundamental Commissioning and Verificationposted by Gail Vittori on
Is it the case that in v4.1, the requirement for a review of the design documents prior to 50% CDs, added with addenda to LEED v4, is no longer a requirement for EAp Fundamental CX in v4.1, but onl
SCAQMD 1168 and CDPH v1.1
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Samantha Lee on
If a product meets the SCAQMD 1168 rule, does that mean it passes the requirements of CDPH v1.1?
LEED guidlines for contractors
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Jade Jenkins on
Hello everyone, I am a project manager and we are going out with an ITT soon.
IAQ Management Program - Sample?
EBOM-v4 EQc1:Indoor air quality management programposted by Josue Diaz on
LEED reference guide states that an "IAQ management program" can be a stand-alone document or incorporated into their O&M Plan (developed for EA prereq Energy Efficiency Best Management Practic