Campus project with Central Plant

NC-v4 EAc4:Demand response
posted by  Brightworks Sustainability  on 

Our project is a student dorm on a university campus.

4
Architect - Cx Provider - Building Performance Specialist
GLHN Architects & Engineers
LEEDuser Premium Member
25 thumbs up
Mon Oct 5, 2020, 6:32 pm

Demand Response Metering

NC-v4 EAc4:Demand response
posted by  Jordan Creveling  on 

In the case of the Fully Automated Response Event Management, is the Meter that is shown providing feedback to the Utility/ISO/CSP suppose to be the Utility's Meter that comes with the Electrical S

3
Architect - Cx Provider - Building Performance Specialist
GLHN Architects & Engineers
LEEDuser Premium Member
25 thumbs up
Mon Oct 5, 2020, 6:29 pm

Demand Response Program demands 50 kW reduction

NC-v4 EAc4:Demand response
posted by  Edgar Arevalo  on 

I have a project in New York CIty where the local utility provides a demand response program where the building would participate in peak load reduction for 4 consecutive hours on a day where the u

3
Architect - Cx Provider - Building Performance Specialist
GLHN Architects & Engineers
LEEDuser Premium Member
25 thumbs up
Mon Oct 5, 2020, 6:22 pm
9
Mon Oct 5, 2020, 6:16 pm

Adding Kitchens in the Minimum IAQ Performance Calculator

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Edgar Arevalo  on 

There is no clear selection for kitchens in the occupancy category of the calculator, and yet when I took a look at the IEQ matrix it shows Kitchen spaces are to be included for IEQp1.  N

3
Energy Engineer
ads ENGINEERS, DPC
LEEDuser Basic Member
21 thumbs up
Sat Oct 3, 2020, 7:56 pm

Dato to pilot become a credit

Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environment
posted by  Adriana Hansen  on 

Hello, I wish to question if you think that this pilot is appliclable to become a credit.

0

Quality views in nonregularly occupied spaces

Pilot-Credits EQpc117:Quality views in nonregularly occupied spaces
posted by  Angela Atehortua  on 

We are currently undertaking a project for a Bank located in the city of Cali, Colombia, this is an office building located in which its premise is to comply with sustainability and bioclimatic cri

0

Partially Naturally Conditioned Spaces

Schools-2009 IEQc7.1:Thermal Comfort—Design
posted by  Kelly Beisswanger  on 

I'm trying to figure out how to pursue this credit when I have classrooms, a gymnasium, and cafeteria that are only heated with no mechanical cooling.

0
2
Thu Oct 1, 2020, 9:05 pm

Defining Minimum Scope of Work of MBCx to Optimize the Investment Cost for The Building Owner

CS-v4 EAc1:Enhanced commissioning
posted by  Titinant   on 

Referring to LEED V4 EAc1 guideline, MBCx is the integration of 3 components: (1) Permanent energy monitoring systems, (2) Real-time energy analysis, (3) Ongoing commissioning.

1
Mon Apr 26, 2021, 4:25 pm