Hotel project in remote island
NC-v4 SSc6:Light pollution reductionposted by Michael Aghabi on
Hello,
We are designing a hotel project in a rural remote area in Saudi Arabia, and have an issue figuring out which Lighting Zone the project falls under.
Daylight Simulation Calculations
NC-v4.1 EQc7:Daylightposted by Jamie Dubbe on
After some research it appears there are a couple of ways to produce the simulation calculations - Insight, LightStanza - however neigther of these are rated as acceptable for use on Depa
Difficulty uploading the form
NC-2009 PIf1:Minimum Program Requirementsposted by Avery Gretton on
Each time that I attempt to upload PI Form 1, this message appears: "Please make sure the correct offline form is uploaded for this credit".
Test makeup water or blowdown water?
NC-v4 WEc3:Cooling tower water useposted by Omar Elrawy on
Dear all,
Should we test makeup water from the water source (incoming), or from inside the cooling tower itself?
Survey conducted before performance period
EBOM-v4 LTc1:Alternative transportationposted by Omar Elrawy on
Is it possible to have the survey conducted before even starting the performance period.
Rainwater events calculator - do I enter days without rainfall events?
NC-v4 SSc4:Rainwater managementposted by Aleksandra Prawda on
Hi all,
Public-Private Partnerships developing LEED Credits - SSpc75
Pilot-Credits SSpc75:Clean constructionposted by Samuel Palmer-Dwore on
After reading the background and support for the SSpc75 credit (https://www.stopthesoot.org/LEED.pdf), it is particularly interesting to see private business catalyzing, or at least sponsoring, the
Green field but planned for development in an industrial zone
NC-v4 LTc2:Sensitive land protectionposted by Thomas Tan on
Dear All,
I have a project which will be built on a lot located in a industrial zone. The lot is used to be natural land but filled up with sand now.
Existing Campus CEP Cooling Towers
NC-v4 WEc3:Cooling tower water useposted by Gregory Mason on
Hi all,