Number of Units Required to be Sampled

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Abena Darden  on 

We are working on a high-rise residential project in San Francisco. I see a question relating to how many residential units need to be blower door tested dating from June 24 2014.

3
Default Avatar
Architect
Efizity
LEEDuser Basic Member
0 thumbs up
Thu Dec 24, 2020, 7:57 pm

Manufacturing waste for compliance

Warehouses-EBOM-v4 MRc4:Solid waste management - ongoing
posted by  FARIZAN DAVEZAC  on 

I have a warehouse with a manufacturing area. The waste from the manufacturing area is already being diverted, as it's collected by a recycling facility.

0

Biophilic Design

NC-2009 IDc1:Innovation in Design
posted by  Brightworks Sustainability  on 

Has anyone successfully pursued Biophilia/Biophilic design as an innovation credit for LEED-NC v3 or v4? If so, what exactly is required? Thank you.

3
Sustainability Strategist
Associated Engineering
LEEDuser Basic Member
2 thumbs up
Thu Dec 24, 2020, 12:00 am

sphagnum peat moss.

NC-v4.1 SSc2:Protect or Restore Habitat
posted by  Dionisio Franca  on 

Hi!
Why should't imported soils include sphagnum peat moss? Is it to protect natural habitats with moss?

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Wed Dec 23, 2020, 10:36 pm

Can lab surfaces be excluded?

CI-v4 EQc6:Interior lighting
posted by  Kristen Magnuson  on 

I'm working on a lab TI. The project's work surfaces include both lab tables and typical office-style workstations.

2
Default Avatar
SL+A INTERNATIONAL ASIA INC.
LEEDuser Premium Member
305 thumbs up
Wed Dec 23, 2020, 9:15 pm

VOC content - all or nothing?

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Tommy Linstroth  on 

Based on this language from USGBC - At least 75% of all paints and coatings, by volume or surface area, meet the VOC&nbsp

4
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Wed Dec 23, 2020, 6:17 pm

No Restrooms!

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Diego Pietzsch  on 

I do have two buildings in the same campus trying to certificate for LEED EBOM.

4
LEED Professor
PUCP, Peru
LEEDuser Basic Member
0 thumbs up
Wed Dec 23, 2020, 1:09 am

Performance period

EBOM-v4 EQc7:Green cleaning - products and materials
posted by  DAVE LI  on 

Does the performance period of the provision only take three months or more?

4
Green Building Consultant | Researcher
GreenA Consultants
LEEDuser Basic Member
38 thumbs up
Wed Dec 23, 2020, 12:22 am

Routine maintenance only- is a Facility Renovation Waste Management Plan necessary?

EBOM-v4 MRc5:Solid waste management - facility maintenance and renovations
posted by  Anna Kaelin  on 

My project diverted furniture during the performance period. The furniture is documented under this credit. Other than that, the project did not undergo any major renovations.

3
Green Building Consultant | Researcher
GreenA Consultants
LEEDuser Basic Member
38 thumbs up
Wed Dec 23, 2020, 12:12 am

EV charging station at shared parking structure

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Yiyi ZHOU  on 

Our project is using a shared parking structure with 500m range from the LEED project. all the EV parking stations are located in that shared parking structure.

0