Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Third Party Certification Table

CI-v4.1 EQc2:Low Emitting Materials
posted by  Zoe French  on 

There is a document for LEED V4 which shows alternative certificate types/testing methods for compliance with this credit. https://www.usgbc.org/resources/low-emitting-materials-third-party-ce

0

Verified Construction & Demolition Recycling Rates

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Atlas Turner  on 

Recently a recycler that is CORR certified has been purchased by another organization.

0

No Landscaping

Homes-v4 WEc1:Total water use
posted by  CT G  on 

We are working on a single-family home project that does not include any landscaping. How would this be taken into account in the calculations for this credit?

0

n

Homes-v4 WEc1:Total water use
posted by  CT G  on 
0
2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Mon Jul 12, 2021, 1:51 pm

Low-impact hydroelectricity

NC-v4 EAc5:Renewable energy production
posted by  CT G  on 

We're working on a project that is off-grid with energy generated via hydroelectricity, that supplies energy only to the building.

3
Default Avatar
LEEDuser Premium Member
19 thumbs up
Thu Jul 8, 2021, 3:53 pm

LEED Charrette

Healthcare-v4 IPp1:Integrative project planning and design
posted by  Molly Jones  on 

Has anyone successfully conducted the half day charrette in segments (2 days @ 2 hours each)?

 

2
Thu Jul 8, 2021, 5:51 am

Smoking Floor

Hospitality-NC-v4 EQp2:Environmental Tobacco Smoke Control
posted by  Summer Gorder  on 

I am working for a Native American Tribal owner who would like to pursue LEEDv4 for a hotel adjacent to their Casino, but there is an expectation to have a designated smoking floor.

2
Thu Jul 8, 2021, 3:41 am

Emissions Certification - Certified Labs under ISO 17025?

NC-v4.1 EQc2:Low-Emitting Materials
posted by  Gregor Braugman  on 

I recently had a pecora product rejected from the Adhesives & Sealants category because the reviewer said that the emissions report from Intertek Labs was not valid becuase it did not list

0

Would Process load considered as Plug Load?

EBOM-v4 EAc5:Advanced energy metering
posted by  ERM Korea  on 

Hello!

To implement Advanced energy metering and Builidng Energy Management System (BEMS), Energy audit Level II was conducted.

0