Forum quick links
Base case System-8
NC-v4 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
We are working on a project where there are multiple AHU's in the single floor. Few AHU's have MERV-14 filtration and in built HRW. The rest of the AHU's only has MERV-8.
Minimum Skylight Fenestration Area
CS-v4.1 EAp2:Minimum Energy Performanceposted by Narguess Kh on
I am working on a data center and planning to use Prescriptive provisions of Sections 5 through 10 to comply with energy credit. The data hall is greater than 232 m2 but they are not occupied.
solar PV Farm adjacent to Datacenter
Data-Centers-NC-v4.1 EAp2:Minimum Energy Performanceposted by S S on
Hello Everyone,
Greetings!
The proposed Datacenter building is intended to achieve LEED certification under LEED v4.1 BD+C Rating system - Datacenter
Product meeting multiple MRc4 methodologies
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Van Jomel Garcia on
Hi! Has anyone encountered a product that complies with more than one compliant MRc4 Methodologies?
Option 2 Strategy E for an Atrium area - No ceiling areas (Open to roof deck above)
NC-v4 EQc6:Interior lightingposted by John Covello on
Hello.
For Option 2, Strategy E.
Can we consider the cafe yard as an open space?
NC-v4 SSc3:Open spaceposted by Dzu Pham on
Hello,
I have a question.
Our project have a cafe space outdoor. Can we consider it as an open space? Can you give me some suggestion?
Option 2: New Building Institute Multifamily Guide under the LEEDv4.1 Residential Multifamily
NC-v4.1 EAc2:Optimize Energy Performanceposted by Anna Korinkova on
Hi,
Multispeed fan to operate at lowest setting when the space in unoccupied?
Retail-CI-v4 EAc2:Optimize energy performanceposted by shashank gangil on
We recently recied following review comment for one of the retail project based in taiwan. The project is using VRF System for cooling. The VRF comes with multispeed fan.
Can a building going for re-certification attempt additional credits that are not performance based
EBOM-v4.1 SSc3:Light Pollution Reductionposted by Frank Weiss on
I understand that a building attempting re-certification is awarded 10 points for their past certification. My question is can a building attempting re-certification using Version 4.1 also at