Recent

LEED Online is not displaying Reginal Priority credit category

NC-v4 RPc1:Regional priority
posted by  Norbert Harmathy  on 

Hello,

We registered a new project under LEED v4 NC. In ALL Credit categories listed, there is NO Regional Priority credit category.

2
www.afogreenbuild.com
Green Building Consultant
LEEDuser Premium Member
249 thumbs up
Wed Jun 23, 2021, 6:24 am

Parking is not close enough!

CI-v4.1 LTc4:Bicycle Facilities
posted by  Jonathan Weiss  on 

Working on projects in dense urban areas, there is rarely parking within the 200 foot or 300 foot walking distance of the building entry.

1
Fri Jun 25, 2021, 1:36 am

Can we certify only the administrative building in a pharmaceutical factory project?

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Amgad Khattab  on 

We have a pharmaceutical factory project consists of the following buildings: -
1. An administrative building (Ground + 3). 
2. A Production building (Ground +2).

1
Fri Jun 25, 2021, 1:58 am

Group Project Scoring

EBOM-v4 EAc7:Renewable energy and carbon offsets
posted by  Andy Rhoades  on 

How do I score EAc7 when certifying for a group project? I have the VER proposals for the three buildings but don't know how to score them together. Thanks!

 

0

Remediation of LEED Project Area or only disturbed areas

NC-v4 LTc3:High priority site
posted by  Mark Meaders  on 

We have a project that has had a Phase 1 and II ESA performed. It found there was acetone and mercury on site.

1
Fri Jun 18, 2021, 2:07 pm

One Product Counting Towards Multiple Credits

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Summer Gorder  on 

Can one product count towards multiple options and/or credits for more points? How does the bonus credit work if a product has an EPD, and meets LCA requirements for Option 2?

3
Default Avatar
Sustainability Engineer
Ecosolutions
LEEDuser Basic Member
6 thumbs up
Fri Jun 18, 2021, 12:13 pm

reduced parking (from pre-existing site condition) counting as "no parking"

NC-v4.1 LTc7:Reduced Parking Footprint
posted by  Chris Flint Chatto  on 

We have a project, a large addition/reconfiguration on an institutional campus, that is being built above, tying into.

2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
469 thumbs up
Fri Jun 18, 2021, 12:00 pm

EV Charging Stations

NC-v4 LTc8:Green vehicles
posted by  Dianne Herrin  on 

Hello - My client is preparing to purchase Tesla EV charging stations to meet LEED v4 requirements. These stations will work only with Teslas.

3
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Wed Jun 16, 2021, 4:55 pm

Radiant Temperature

EBOM-v4 EQc3:Thermal comfort
posted by  Craig Wilson  on 

What is the difference between air temperature and radiant temperature?

1
Fri Jul 30, 2021, 3:52 am

Renewable Energy - Confirmation of Renewable Attribute Ownership

CS-v4.1 EAc5:Renewable Energy
posted by  Levi Jimenez  on 

We have a site with a substantial solar array that is owned by the building owner.  The LEED Credit form requires uploaded supporting documentation as follows: "upload confirmation

3
Wed Jun 16, 2021, 2:50 pm