Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Non-native/adapted species vs. Adapted species

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Jeff Wiedmeyer  on 

Our USGBC reviewer commented on the three requirements of a "lawn" per previous LEED Interpretations, one of which read, "lawn is only acceptable if it does not include any non-native/adap

1
Thu Sep 9, 2021, 12:05 pm

Guestroom Closets and Bathrooms - Non-Regularly Occupied?

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Kevin Mowatt  on 

USGBC's IEQ v2009 Space Matrix indicates that Guestrooms (in their entirety) should be considered Regularly Occupied.

0

Energy Star Protfolio Manager

EBOM-v4 EAp2:Minimum energy performance
posted by  Sarfaraj Khan  on 

Hi Can international project (UAE) attempting LEED V4 O&M can used Energy Star Protfolio Manager Regards

3
Tue Sep 7, 2021, 10:08 pm

Choose baseline system for CAV factory

NC-v4 EAp2:Minimum energy performance
posted by  Hyerim Kim  on 

 

I am doing factory served by CAV AHU, cooling only. Constant volume is due to positive pressurization to avoid infiltration.

1
Tue Sep 7, 2021, 3:30 pm

Green Power Query

NC-v4 EAc7:Green power and carbon offsets
posted by  Andrei Sabater  on 

I am Andrei Sabater, employee of ecoSolutions, Right now we are currently studying the credit for the green power and carbon offsets. Is the credit applicable here in the Philippines?

8
Sustainability Consultant
AECOM
LEEDuser Basic Member
2 thumbs up
Mon Sep 6, 2021, 8:04 pm

How to face nova mutation virus by using Re-Enter Your Workspace method?

Pilot-Credits INpc136:Safety First: Re-Enter Your Workspace
posted by  yingling guan  on 

ReOccupancy_Assessment_Tool is a good guide for the proverty management of public areas, but it is difficult to implement the internal management of small tenants.  Is there a convenient tool

0

Option 2 - All or nothing

NC-2009 MRc5:Regional Materials
posted by  Jaida Anderson-Lozano  on 

Our project has been collecting documentation for this credit for some time with Option 1 before Option 2 addendum became available.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Sun Sep 5, 2021, 7:52 am
2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Fri Sep 3, 2021, 7:47 pm
1
Mon Sep 13, 2021, 6:58 am