Post a question or comment
Filter by location
Forum
Topic
Replies
Recent
5
Thu Apr 28, 2022, 3:08 pm

WEpc94 No Cooling Tower

Pilot-Credits WEpc94:No Cooling Tower
posted by  Dave Hubka  on 

This ACP will soon be closed. Once closed it will not be available regardless of project registration date. 

10
Thu Apr 28, 2022, 1:55 pm

USGBCs online web-based reference guide

NC-v4 MPR1:Must be in a permanent location on existing land
posted by  Kavita Karmarkar  on 

Posting this question here since it does not belong to any credit in particular.

4
Thu Apr 28, 2022, 10:26 am
1
Wed Apr 27, 2022, 9:31 pm

TR-55 availabe outside US

Pilot-Credits SSpc45:Site assessment
posted by  Javier Garcia Jones  on 

Hi, We are working in a project that it's an extension of an existing building. Our project is located on an almost flat plot. We have consider all issues related to this credit but we have some pr

3
Default Avatar
Principal
Recollective Consulting
LEEDuser Premium Member
3 thumbs up
Wed Apr 27, 2022, 7:21 pm

Non-certified buildings in LEED boundary

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  marty seese  on 

I have a project that is all new construction. There are 3 buildings on the site. The main building which is what the owner wants to be LEED Certified. Another building is a shed building.

3
Wed Apr 27, 2022, 7:04 pm

NC & CI projects

Pilot-Credits WEpc110:Water Restoration Certificates®
posted by  Sheryl Swartzle  on 

I found the purchasing process for Water Restoration Certificates to be very easy with BEF.  The benefits are easily understood by the clients and on our CI project the cost was very reas

2
Default Avatar
Sustainability Consultant
Steven Winter Associates
LEEDuser Premium Member
0 thumbs up
Wed Apr 27, 2022, 4:31 pm

HVAC Background Noise - sound rating methods

NC-v4.1 EQc9:Acoustic Performance
posted by  Iris Meeker  on 

For the HVAC Background Noise, do all spaces have to use the same Sound Rating Method (NC/RC, dBA, dBC, RC(N)), or can these vary by individual space or by space type?

1
Mon Mar 10, 2025, 2:33 pm

Interpretation of text relating to Envelope

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Keith Fahy  on 

Hi, see here an extract from the Reference Guide: "The envelope must be covered in the OPR and BOD, but full envelope commissioning is not required unless the project team pur

0

Disinfectants with EPA Registration No. and on List N: Disinfectants for Coronavirus (COVID-19)

EBOM-v4 EQc7:Green cleaning - products and materials
posted by  DINGTIAN OU  on 

Few green disinfectants (e.g. Green Seel, UL or EPA Safer Choice Standard certified) are available in Hong Kong market.

Our clients proposed two commonly used disinfectants:

1
Mon May 2, 2022, 7:20 pm