Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Can warehousing ramp lighting for transportation exempt from Light Pollution Reduction

CS-v4 SSc6:Light pollution reduction
posted by  yingling guan  on 

There is a warehouse building project, with outdoor transport ramp beside buildings.  Many exterior lighting designed on the ramp for directional and marker lighting for transportation, a

4
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Wed Jun 8, 2022, 3:02 am
1
Tue Jun 7, 2022, 7:22 pm

Correctional Facility lighting

NC-v4 SSc6:Light pollution reduction
posted by  Lawrence Rennell  on 

Government mandated roadway lighting is exempted from light pollution reduction calculations. What about correctional facilities?

1
Mon Jun 6, 2022, 9:42 pm

Entire building vs tenant space recyclables collection

CI-v4.1 MRp1:Storage and Collection of Recyclables
posted by  Neumann Monson  on 

The credit language says the project needs to provide dedicated areas for collection and storage for the "entire building".  If a project is a tenant space within a larger existing mixed use b

1
Tue Jun 7, 2022, 11:21 pm

EPDs for slag and Portland cement in multiple concrete mixes

NC-v4.1 MRc2:Environmental Product Declarations
posted by  Linda Davisson  on 

Our Project Team would like to confirm if EPDs can be listed in the MR Calculator multiple times for slag and Portland Cement when used in multiple concrete mixes with different

3
Fri Jun 3, 2022, 4:35 pm
1
Fri Sep 23, 2022, 10:21 am

School- Combination Oven (p2 et credit)

Schools-NC-v4 WEp2:Indoor water use reduction
posted by  Priscillia Champagne  on 

Hi LeedUser, My supplier specialist asked me 2 questions on Combination Oven :

1
Fri Jan 13, 2023, 9:00 pm

Discrepancy material price from budget and actual cost

NC-2009 MRc4:Recycled Content
posted by  Charline SEYTIER  on 

We used the budget method for all divisions concerned to calculate the total material cost and we are now using the actual cost for the big tickets items to achieve our objectives. On some items, w

7
Thu Jun 2, 2022, 8:53 pm

Open spaces - Turf Grass Calculation

Schools-NC-v4 SSc3:Open space
posted by  Michael J Turner  on 

Hi There, 

Is Turf grass included in the calculations as vegetated open space? We have a school project. It is LEED V4.0 and we are going with V4.1 for this credit. 

0

Waste to Energy Facility

Schools-NC-v4.1 MRp2:Construction and Demolition Waste Management
posted by  Dianna Brockhoff  on 

Has anyone encountered a situation where the waste management facility they are using for diversion is in a test pilot for waste to energy?

0