Forum quick links
Projects in Europe
Pilot-Credits MRpc102:Legal Woodposted by Ward Miller on
As of October 2010, the European Union adopted the EU Timber Regulation (EUTR, Regulation 995/2010) to prevent sales of illegal timber and timber products within the EU's internal market.
Required Response Rate
EBOM-v4.1 EQp4:Indoor Environmental Quality Performanceposted by Hannah Walter on
The graph in Figure 1 seems to indicate that the absolute minimum response rate is 25%.
Quality View_Views into Atrium
NC-v4.1 EQc8:Quality Viewsposted by Ilaria Colombo on
Hi everyone,
We have an office building with two floors and an internal atrium that crosses them.
Pilot Credit - LTpc134 Advanced Transportation Monitoring - how do you share the data?
CS-v4.1 INc1:Innovationposted by Lauren Leatherbarrow on
For LEED v4 Core & Shell 14 story office building in USA with underground garage we are attempting this credit - monitoring the garage traffic and at the elevator turnstiles. The requirem
Demand response infrastructure associated costs
NC-v4 EAc4:Demand responseposted by Julio Fernandez Amodia on
Hi there,
I am currently assessing the feasibility of this credit. As per now I am aiming for Case 2. since there is no know DR program available.
Project Boundary School Campus Project
NC-2009 SSc8:Light Pollution Reductionposted by david naughton on
I have a project in which all of the project boundaries border campus property except for one which borders a county road. Do I only need to be concerned with light trespass on the boundary t
RECs - projects outside the U.S.
NC-v4 EAc7:Green power and carbon offsetsposted by Camila Rossini on
Could anyone help me verfify if the following understandig is correct? Tks!
Water management
EBOM-v4.1 SSc1:Rainwater Managementposted by Saba Hajizadeh on
I have read the V4.1. But still, I'm confused.
In a summary how are we gonna apply this credit to the project?
Perimeter area calculation
Healthcare-v4 EQc7:Daylightposted by Priscillia Champagne on
Does anyone know if the perimeter area to be used for Healthcare projects excludes from the calculations the non-regularly occupied space within that perimeter, or do we need to include the whole a
LEED OM V4.1 Location problem
EBOM-v4.1 LTp1:Transportation Performanceposted by Saba Hajizadeh on
Hello everyone,
I'm working on a project, the location of this building is Iran, but I couldn't find it on the ARC website. Do you have any suggestions? What should I do?