Forum quick links
RECs - projects outside the U.S.
NC-v4 EAc7:Green power and carbon offsetsposted by Camila Rossini on
Could anyone help me verfify if the following understandig is correct? Tks!
Water management
EBOM-v4.1 SSc1:Rainwater Managementposted by Saba Hajizadeh on
I have read the V4.1. But still, I'm confused.
In a summary how are we gonna apply this credit to the project?
Perimeter area calculation
Healthcare-v4 EQc7:Daylightposted by Priscillia Champagne on
Does anyone know if the perimeter area to be used for Healthcare projects excludes from the calculations the non-regularly occupied space within that perimeter, or do we need to include the whole a
LEED OM V4.1 Location problem
EBOM-v4.1 LTp1:Transportation Performanceposted by Saba Hajizadeh on
Hello everyone,
I'm working on a project, the location of this building is Iran, but I couldn't find it on the ARC website. Do you have any suggestions? What should I do?
Credit Denied -- Trying to use the v4.0 Core & Shell 15% energy rule in v4.1 Renewable Energy
NC-v4.1 EAc5:Renewable Energyposted by Harry Flamm on
To achieve 3 points in this credit in v4.1, our Core & Shell project recently submitted purchased REC's based upon 15% of the project’s floor area -- as p
Fire Treated Plywood - how to document PS 1 or PS 2 standard?
NC-v4 EQc2:Low emitting materialsposted by Erin Holdenried on
Anybody have advice on how to document a plywood product is manufactured to PS-1 or PS-2 standard for fire treated products? I am getting pushback from GBCI for Hoover Pyro-guard products.
Data Center load for Renewable Energy design
Data-Centers-NC-v4 EAc2:Optimize energy performanceposted by Instra Ingenieros on
We have a question about the energy simulation of a Data Center. We have completed the v4 Minimum Energy Performance Calculator introducing full IT and initial IT loads.
Art Lab with Machines/ Equipment
NC-v4 EQc6:Interior lightingposted by Johanna Turko on
We have an art lab which has a ton of equipment/machines that students use for metal working/ pottery/ etc.
Unbundling Parking
CS-v4.1 LTc7:Reduced Parking Footprintposted by Allison Wilson on
The credit language reads, "Implement a daily parking fee at a cost equal to or greater than the daily roundtrip cost of municipal public transit." Is a parking garage then prohibited from selling