Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED AP Certificate

CI-2009 IDc2:LEED Accredited Professional
posted by  Michelle Bracewell-Musson  on 

Thank you for your comments. I have gone to USGBC and into the My Account section and looked in Personal Information, Membership, Accreditation, etc. and still cannot find it.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Sun Feb 27, 2011, 7:57 pm

Approval without any additional approval from the jurisdiction?

NC-2009 IEQp1:Minimum IAQ Performance
posted by  William Weaver  on 

Below is a previously submitted credit interpretation that was accepted. Our project is almost identical to the situation that is outlined.

3
LEED Fellow, WELL AP
JLL
LEEDuser Basic Member
125 thumbs up
Sat Feb 26, 2011, 1:55 pm

CRI vs. noise level for vacuums.

EBOM-2009 IEQc3.4:Green Cleaning—Sustainable Cleaning Equipment
posted by  Jared Silliker  on 

In responding to review comments on a recent project I'm realizing that the vacuum requirement contains two separate elements, which I previously saw as one.

4
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Sat Feb 26, 2011, 6:05 am

Existing Building Envelope Calculations - Help!

NC-2009 EAc1:Optimize Energy Performance
posted by  Jonathan Weiss  on 

According to the Appendix G definition, "for existing building envelopes, the baseline building design shall reflect existing conditions prior to any revisions that are part of the scope of work be

3
Jacobs Buildings & Infrastructure
LEEDuser Premium Member
140 thumbs up
Sat Feb 26, 2011, 12:42 am

LEED Online Templates (BETA vs. Version3)

Schools-2009 EAp2:Minimum Energy Performance
posted by  Maya Karkour  on 

Dear all, I am currently filling the LEED Online Letter templates. Some of these are BETA version.

3
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Fri Feb 25, 2011, 6:15 pm

Printing used for bldg occupants, but outsourced

EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumables
posted by  Ted Mendoza  on 

I have a client that has several departments under a building that is being LEED EB-OM certified. One of the departments has a "significant" budget attributed to generating handouts, flyers, etc.

6
Fri Feb 25, 2011, 12:46 pm

Use of clerestories for IEQc8.1?

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Karen Stewart  on 

After review of the requirements for IEQc8.1, it appears to me that light from clerestories is not allowed in the calculations for this credit. Am I missing something?

7
Fri Feb 25, 2011, 3:16 am

Clarification on Minimum Daily Transit Service

Pilot-Credits PC12:Reduced Automobile Dependence
posted by  Colin Inderwish  on 

We're also attempting option 1. The project is located in a fairly dense area with a total of 4 different light rail stops within a 1/2 mile walking distance.

2
Thu Feb 24, 2011, 8:20 pm

online form

NC-2009 MRc2:Construction Waste Management
posted by  Rick Vayo  on 

Hi, I'm having trouble with the online form. I've filled in the required information, but the percentage of waste diverted is not totaling for me. I'm not sure what I'm doing wrong. thanks,

3
Default Avatar
EcoConsulting
LEEDuser Basic Member
549 thumbs up
Thu Feb 24, 2011, 7:48 pm

Electric bicycles in Asia

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Louise Schlatter  on 

We are starting to get projects in Asia and have learned that they use both standard (human operated) bicycles and also something we don't have in the US: electric bicycles.

7
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Feb 24, 2011, 3:16 pm