Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Frances Yang on
We would very much like to pursue this credit on our project. However, we have some unusual wall assemblies for blast resistance.
Prerinse spray valves & Water temperature tempering
Pilot-Credits WEpc18:Appliance and process water use reductionposted by Gabriele E. Bibee on
I am unable to get clarification on two requirements for this Pilot credit: 1) the prerinse spray valve flow rate of 1.3 gpm. Does this apply to dishwashers?
Water Efficiency - Dual Flush Valve GPF Average Explanation
Schools-2009 WEc3:Water Use Reductionposted by Matthew Higgins on
I'm currently working on a school renovation that's aiming to achieve a LEED Silver rating. One of the credits that we're after is Water Efficiency Credit 3 (35% water savings).
Gross square footage discrepancy
NC-2009 EAp2:Minimum Energy Performanceposted by Aliesa Adelman on
If the energy model uses net area instead of the LEED definition of gross floor area, how is this discrepnacy reconciled?
Core and Shell Definition
CS-2009 EAc1:Optimize Energy Performanceposted by Tom Nichols on
Can a building without a core HVAC systems be certified under LEED CS? For example, a two story building with a 6,500 ft2 footprint per floor.
SSc7.2 Inquiry - Subterranean 'Roof'
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Patrick MacPherson on
Hello, The project I am working on consists of a tower with subterranean spaces that lie beyond the tower's footprint.
Phase II
Schools-2009 SSp2:Environmental Site Assessmentposted by Terry Squyres on
If your project finds contamination on site during construction, does remediation have to be complete before the LEED design application can be submitted?
Excluding Casework from IEQc8.1 & IEQc8.2
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by John Drigot on
On a previous LEED for Schools 2009 project I was sucessful in not including the space occupied by built-in casework in the occupied square footage of a space.
LEED Boundary and equipment
CS-2009 EAp2:Minimum Energy Performanceposted by Gabriela Hernández Castillo on
We have a mixed use project with several buildings on it, from which one of them will apply for LEED-CS certification.
Occupancy Sensors
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Lindsay Duncan on
In the past GBCI has stated as a side note: "For future projects, please note that occupancy sensors alone are not an acceptable form of lighting control".