Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materials
posted by  Frances Yang  on 

We would very much like to pursue this credit on our project. However, we have some unusual wall assemblies for blast resistance.

3
Thu Apr 21, 2011, 9:13 pm

Prerinse spray valves & Water temperature tempering

Pilot-Credits WEpc18:Appliance and process water use reduction
posted by  Gabriele E. Bibee  on 

I am unable to get clarification on two requirements for this Pilot credit: 1) the prerinse spray valve flow rate of 1.3 gpm. Does this apply to dishwashers?

5
Thu Apr 21, 2011, 2:29 pm

Water Efficiency - Dual Flush Valve GPF Average Explanation

Schools-2009 WEc3:Water Use Reduction
posted by  Matthew Higgins  on 

I'm currently working on a school renovation that's aiming to achieve a LEED Silver rating. One of the credits that we're after is Water Efficiency Credit 3 (35% water savings).

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Apr 19, 2011, 6:24 pm

Gross square footage discrepancy

NC-2009 EAp2:Minimum Energy Performance
posted by  Aliesa Adelman  on 

If the energy model uses net area instead of the LEED definition of gross floor area, how is this discrepnacy reconciled?

5
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Mon Apr 18, 2011, 9:57 am

Core and Shell Definition

CS-2009 EAc1:Optimize Energy Performance
posted by  Tom Nichols  on 

Can a building without a core HVAC systems be certified under LEED CS? For example, a two story building with a 6,500 ft2 footprint per floor.

3
Default Avatar
LEED AP (O+M)
4 Elements Group
LEEDuser Basic Member
34 thumbs up
Sun Apr 17, 2011, 6:58 pm

SSc7.2 Inquiry - Subterranean 'Roof'

CS-2009 SSc7.2:Heat Island Effect—Roof
posted by  Patrick MacPherson  on 

Hello, The project I am working on consists of a tower with subterranean spaces that lie beyond the tower's footprint.

5
Default Avatar
Senior Consultant
Sustainable Design Consulting
LEEDuser Basic Member
12 thumbs up
Fri Apr 15, 2011, 2:47 pm

Phase II

Schools-2009 SSp2:Environmental Site Assessment
posted by  Terry Squyres  on 

If your project finds contamination on site during construction, does remediation have to be complete before the LEED design application can be submitted?

6
Principal
Studio4, LLC
LEEDuser Expert
120 thumbs up
Thu Apr 14, 2011, 3:42 pm

Excluding Casework from IEQc8.1 & IEQc8.2

Schools-2009 IEQc8.1:Daylight and Views—Daylight
posted by  John Drigot  on 

On a previous LEED for Schools 2009 project I was sucessful in not including the space occupied by built-in casework in the occupied square footage of a space.

2
Wed Apr 13, 2011, 4:22 pm

LEED Boundary and equipment

CS-2009 EAp2:Minimum Energy Performance
posted by  Gabriela Hernández Castillo  on 

We have a mixed use project with several buildings on it, from which one of them will apply for LEED-CS certification.

2
Tue Apr 12, 2011, 10:16 pm

Occupancy Sensors

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Lindsay Duncan  on 

In the past GBCI has stated as a side note: "For future projects, please note that occupancy sensors alone are not an acceptable form of lighting control".

3
Default Avatar
Vice President
Thornton Tomasetti
LEEDuser Premium Member
188 thumbs up
Tue Apr 12, 2011, 8:06 pm