Occupancy Sensor
CI-2009 EAp2:Minimum Energy Performanceposted by Simon Sue on
We have a project which has a big " function" area . this particular area is for employees to hang out + meet up with customers + briefing area (with a formal meeting table, projectors).
EAPr2 - Lighting Control (shut-off control and space control)
CI-2009 EAp2:Minimum Energy Performanceposted by Ramesh Narayanan on
Could you please anybody elaborate what is the difference between the shut-off device control requirement and speace control device requirement mentioned in the Ashrae standard lighting mandatory p
Interpretation table 5.5-4 ASHRAE 2007 mandatory provisions
NC-2009 EAp2:Minimum Energy Performanceposted by Vindio Corro on
We are preparing the LEEd for a Stadium in Spain and I have a doubt with the conditioned areas. The level -2 is conditioned and the level -1 (parking) is unconditioned...which is the U-factor we ha
LEED CS & LEED CI - PV array
CS-2009 EAc1:Optimize Energy Performanceposted by S. Sachs on
Hi, I am working on a LEED CS project, at the same time the tenant is pursuing LEED CI (separate submission) and planning to install a PV array to achieve the 2.5% of building electricty required
Estimated crown diameter
Pilot-Credits PC14:Walkable Streetsposted by Christina Lynch on
Does anyone have a good resource for or way of calculating a tree's estimated crown diameter? (Benchmark "m" for NC/CS or "f" for Schools). Thanks!
Unirrigated areas in Option 1
NC-2009 WEc1:Water Efficient Landscapingposted by Eamon Geary on
Hello, One project is working to achieve this credit via Option 1 (50% reduction in potable water use). Through a variety of common methods, we have reduced our irrigation water use.
ASHRAE 62.1 - 2007 section 5.9 Particulate Matter Removal
NC-2009 IEQp1:Minimum IAQ Performanceposted by Carolina Vergnano on
To comply with the section 5.9, Particulate Matter Removal, the HVAC system needs to have a filter or an air cleaner having a minimum efficiency of MERV 6. Does this filter needs exactly be insid
WEp1 Scope or Space?
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Michelle Bracewell-Musson on
The Bird's Eye above states only fixtures within the project 'SCOPE' which would mean that a project that does not include plumbing fixtures, would be exempt.
Water Use in a Horizontal Expansion
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Neil Rosen on
What do you do if you are constructing a horizontal expansion but you have no plumbing fixtures in the expansion?
commissioning performance period
EBOM-2009 EAc2.2:Existing Building Commissioning—Implementationposted by Pablo Fortunato Suarez on
This is for a 1st time EBOM project (not recertification). If Six Sigma Projects were initiated 5 years prior to LEED registration but implemented every year thereafter until the present time: 1)