Forum quick links
Must submeters not within Option 2 list be read weekly?
EBOM-2009 WEc1:Water Performance Measurementposted by Vanessa Seibert on
We have a main, fire water and irrigation meter. If read weekly and calibrated properly we have what is needed to obtain 2 points in this credit.
PE Stamp on SEP
EBOM-2009 EAc6:Emissions Reduction Reportingposted by Carrie Bradley on
EAc1 and EAp2 don't require a PE seal. Is it really required on the SEP submittal for this credit?
Weekly Meter Readings
EBOM-2009 WEc1:Water Performance Measurementposted by Wendy Gibson on
I am wondering if the weekly meter readings need to be done on the same day every week?
VOC limits declaration for European Materials
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Alessio Zampaglione on
Can someone tell me some informations about using materials with VOC limits tested with testing method other than SCAQMD? for example like GEV - EMICODE E1?
Interior Construction
CS-2009 WEp1:Water Use Reductionposted by Joaquim Lima on
Good morning, My building is a residential building and was certified as core & shell, credit MR - 4 (Recycled Content) there is a paragraph that says interior construction is not part of the
Too much daylight?!?!
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by Tyler Barter on
Hello, I am in the process of working on collecting information for LEED certification on 3 different schools that all have large amounts of glass in the cafeteria, gym, and Library, as well as a f
Interior Glazed Walls
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Richard Reed on
For prescriptive method 2, We have shallow depth perimeter offices with full height glass walls facing the interior spaces.
LEED for Schools 2007 version WEc3 Exemplary Performance
Schools-2009 WEc3:Water Use Reductionposted by Glen Boldt on
We are working on a LEED for Schools (v 2007 -- again, listed here because there's no v2 Schools section) that just had an exemplary performance strategy denied for achieving >40% reduction.
Credit Closing in July
Pilot-Credits PC20:Recycled Contentposted by Batya Metalitz on
This credit will be closing in July 2011, with the launch of the LEED 2012 2nd Public Comment period.
Bio-Based Materials Credit
NC-2009 IDc1:Innovation in Designposted by Robert Phinney on
NAVFAC is 'requiring' that projects achieve an ID credit for Bio-based materials.