Forum quick links
MRc5 Metal Stud... Assembly? Reused Furniture Manftr AND Extrxn?
CI-2009 MRc5:Regional Materialsposted by Simon Sue on
In review comments recently received by our team for a LEED-CI Retail project, the following portions have confused us: 1. "Products from _____ vendor...
Purchases for Repairs
EBOM-2009 MRc9:Solid Waste Management—Facility Alterations and Additionsposted by Reynaldo Castro on
We are a convention center and certified under pre-existing building requirements. We have a lot of shows and clients moving in and out.
uncondtioned space and natural ventilation
CS-2009 IEQp1:Minimum IAQ Performanceposted by Luis Miguel Diazgranados on
Hello We are working on a office building applying for LEED CS. The building is going to be naturally ventilated.
Baseline system selection for Laboratory
NC-2009 EAc1:Optimize Energy Performanceposted by Ramesh Narayanan on
G3.1.1 exception c stating "For Laboratory spaces with a minimum of 5000 cfm of exhaust, use system type 5 or 7 that reduce the exhaust and makeup air volume to 50% of the design values during unoc
Is exterior lighting included?
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Aaron Levey on
We have a restaurant project (LEED for Retail: CI) in which the tenant has a open space. There is a canopy outside used for retail purposes and obviously some exterior lighting.
CO2 sensor in area designated for F&B (C&S project)
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by William Wong on
Our core and shell commecial development involves designation of one floor of the builidng for F&B and design density is higher than 25 people per 1,000 sq ft.
Office Building Outside US
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Omer Moltay on
Which path is to be followed for an office building outside the US? Is this considered to be eligible for an Energy Star rating?
Supplemental Calculator
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by Lauren Fakhoury on
This supplemental calculator Excel file only seems to create problems every time I used it!
Project Boundary, Site Boundary and Building
CI-2009 SSc1:Site Selectionposted by Arlee Fisher on
We are working on a remodel project encompassing three distinct areas within one portion of a hospital and I am not confident with my understanding of the definitions of Project Boundary vs.
Hospital Fixture Groups
NC-2009 WEc3:Water Use Reductionposted by Susan Walter on
I'm debating how to set up my fixture groups for a large healthcare project. Initially, it makes sense to split into two groups: inpatient and outpatient/other.