Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

MRc5 Metal Stud... Assembly? Reused Furniture Manftr AND Extrxn?

CI-2009 MRc5:Regional Materials
posted by  Simon Sue  on 

In review comments recently received by our team for a LEED-CI Retail project, the following portions have confused us: 1. "Products from _____ vendor...

4
Default Avatar
SL+A INTERNATIONAL ASIA INC.
LEEDuser Premium Member
305 thumbs up
Thu Nov 24, 2011, 4:02 am

Purchases for Repairs

EBOM-2009 MRc9:Solid Waste Management—Facility Alterations and Additions
posted by  Reynaldo Castro  on 

We are a convention center and certified under pre-existing building requirements. We have a lot of shows and clients moving in and out.

2
Default Avatar
ecoPreserve: Building Sustainability
LEEDuser Basic Member
101 thumbs up
Wed Nov 23, 2011, 5:32 pm

uncondtioned space and natural ventilation

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Luis Miguel Diazgranados  on 

Hello We are working on a office building applying for LEED CS. The building is going to be naturally ventilated.

2
Principal, Energy and Engineering Leader
DLR Group | Westlake Reed Leskosky
LEEDuser Expert
267 thumbs up
Wed Nov 23, 2011, 4:15 pm

Baseline system selection for Laboratory

NC-2009 EAc1:Optimize Energy Performance
posted by  Ramesh Narayanan  on 

G3.1.1 exception c stating "For Laboratory spaces with a minimum of 5000 cfm of exhaust, use system type 5 or 7 that reduce the exhaust and makeup air volume to 50% of the design values during unoc

3
Wed Nov 23, 2011, 2:08 pm

Is exterior lighting included?

CI-2009 EAc1.1:Optimize Energy Performance—Lighting Power
posted by  Aaron Levey  on 

We have a restaurant project (LEED for Retail: CI) in which the tenant has a open space. There is a canopy outside used for retail purposes and obviously some exterior lighting.

2
Wed Nov 23, 2011, 12:47 pm

CO2 sensor in area designated for F&B (C&S project)

CS-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  William Wong  on 

Our core and shell commecial development involves designation of one floor of the builidng for F&B and design density is higher than 25 people per 1,000 sq ft.

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Wed Nov 23, 2011, 10:50 am

Office Building Outside US

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Omer Moltay  on 

Which path is to be followed for an office building outside the US? Is this considered to be eligible for an Energy Star rating?

5
Default Avatar
Sustainable Cost Solutions LLC
LEEDuser Premium Member
195 thumbs up
Tue Nov 22, 2011, 9:30 pm

Supplemental Calculator

Schools-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Lauren Fakhoury  on 

This supplemental calculator Excel file only seems to create problems every time I used it!

4
Tue Nov 22, 2011, 8:59 pm

Project Boundary, Site Boundary and Building

CI-2009 SSc1:Site Selection
posted by  Arlee Fisher  on 

We are working on a remodel project encompassing three distinct areas within one portion of a hospital and I am not confident with my understanding of the definitions of Project Boundary vs.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Nov 22, 2011, 4:28 pm

Hospital Fixture Groups

NC-2009 WEc3:Water Use Reduction
posted by  Susan Walter  on 

I'm debating how to set up my fixture groups for a large healthcare project. Initially, it makes sense to split into two groups: inpatient and outpatient/other.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Tue Nov 22, 2011, 1:43 pm