Sealant for Joints

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Maya Karkour  on 

Hi, I am was wondering if the sealants for concrete joints (slab on grade) at a basement level, must comply with the requirements.

4
Sat Dec 3, 2011, 9:31 pm

MR c3.2 Materials Reuse - Furniture & furniture

CI-2009 MRc3.2:Materials Reuse—Furniture and Furnishings
posted by  Pamela Branch  on 

My client is a small non-profit, and on a shoe string budget. They are using used or donated furniture for 100% of their Furniture/Furnishings.

2
Sustainability Specialist
Wight and Company
LEEDuser Basic Member
415 thumbs up
Sat Dec 3, 2011, 4:53 am

IEQp1 compliance for high-rise with 1 outdoor air intake

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Dawn Brenner  on 

The 1987 high-rise building in California I am attempting LEED certification for has an EnergyStar label and, thus, was signed off by a PE as meeting ASHRAE 62.1/2007.

3
Default Avatar
Director of Engineering & Sustainability
Qualis Group LLC
LEEDuser Basic Member
15 thumbs up
Fri Dec 2, 2011, 3:08 pm

SSc2 Option2

CI-2009 SSc2:Development Density and Community Connectivity
posted by  Holly Himes  on 

Does the entire residential area within the 1/2 mile radius need to be 10 units per acre or more or just a selection of higher density housing choices within the 1/2 mile radius?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Dec 2, 2011, 1:59 pm

Documenting the credit...

CI-2009 SSc2:Development Density and Community Connectivity
posted by  Jennifer Berthelot-Jelovic  on 

I am currently submitting for a LEED CI v3.0 project and need to document the Development Density. I have no issues with Community Connectivity.

3
Fri Dec 2, 2011, 1:58 pm

Vacancy - EQp1 Calculations

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Alice Cook  on 

We have a floor that is vacant in our project building.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Dec 2, 2011, 1:23 pm

Measure AHUs or measure air flow in each room?

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Michelle Perez  on 

Hello, We are currently working on a LEED EBOM project at our University campus.

2
Director of Operations
Transwestern Sustainability Services
LEEDuser Basic Member
355 thumbs up
Fri Dec 2, 2011, 1:10 pm

Wood Palettes

NC-2009 MRc2:Construction Waste Management
posted by  Samantha De Leuw  on 

On my project, the subcontractors are responsible for reusing wood palettes and, if applicable, selling them back to the manufacturer. Is there a way to record this?

3
LEED AP / Founder
www.BCdesignbuild.com
LEEDuser Premium Member
37 thumbs up
Thu Dec 1, 2011, 9:10 pm

Baseline HVAC system and envelope for hospital patient rooms

NC-2009 EAp2:Minimum Energy Performance
posted by  Mark Benson  on 

I'm not sure of the Baseline envelope and HVAC system to use in hospital patient rooms. For one, Section 3.2 defines "residential" as including patient rooms in hospitals.

5
Thu Dec 1, 2011, 6:48 pm

Existing Building undergoing major renovation

NC-2009 EAp2:Minimum Energy Performance
posted by  thomas beal  on 

ASHRAE 90.1 states that existing buildings shall be modeled as is before renovations. Currently the building has all of the window openings boarded up.

3
Wed Nov 30, 2011, 10:32 pm