Base Building water flow vs. TI water flow...
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Garrett Billings on
We have a small TI project that is struggling with the WEp1 credit. We have built out a suite in a building that already qualified for LEED Certified.
No Recycling Program...yet
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by SIG - Sustainability Main Account on
Senario: Building not currently recycling.
How many survey answers are required?
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Maria Porter on
I think this subject has been discussed before but I can’t find the answer. How many percent of building occupants must answer the survey for it to be a valid result?
IE for manual irrigation
NC-2009 WEc1:Water Efficient Landscapingposted by Dario Ibarguengoitia on
¿what is the IE for manual irrigation? I will use no potable water for this, I will apreciate your response cause asked about this once and did not got an answer, thank you very much
Can we involve PPA's?
Schools-2009 EAc2:On-Site Renewable Energyposted by kerrie kannberg on
Is there any way to involve a PPA (Power Purchase Agreement) or similar funding mechanism for EAc2? The language in the guide is not specific, as they mention a "energy system owner".
Epoxy for walls
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Erica Downs on
does anyone know how epoxy wall paint would be classified? simply as paint? or an architectural coating? is it even covered under LEED? thanks!
Open Space Requirement
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Elliot Powers, LEED AP BD+C on
Count me in with those frustrated with this credit language/ requirements.
No irrigation at all
CS-2009 WEc1:Water Efficient Landscapingposted by Yanina Ibañez on
Hello, in my project there will be no irrigation at all because of the adapted plants plant in all the green roofs. How do we demonstrate the achievement of the credit?
POLYETHYLENE TEREPHTHALATE (PET)
Pilot-Credits PC11:Chemical Avoidance in Building Materialsposted by Julie Hendricks on
I'm thinking of submitting for this pilot credit with one of my products being a type 6,6 Interface carpet tile (Tectonics).
timeline for investigation and analysis
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Pablo Fortunato Suarez on
My clients have prepared six-sigma projects for improvement that have a timeline of 5 years (since 2006).