Base Building water flow vs. TI water flow...

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Garrett Billings  on 

We have a small TI project that is struggling with the WEp1 credit. We have built out a suite in a building that already qualified for LEED Certified.

4
Default Avatar
SL+A INTERNATIONAL ASIA INC.
LEEDuser Premium Member
305 thumbs up
Mon Dec 12, 2011, 3:45 am
4
Thu Dec 8, 2011, 5:34 pm

How many survey answers are required?

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Maria Porter  on 

I think this subject has been discussed before but I can’t find the answer. How many percent of building occupants must answer the survey for it to be a valid result?

3
Sustainability specialist
Skanska Sweden
LEEDuser Basic Member
205 thumbs up
Thu Dec 8, 2011, 3:09 pm

IE for manual irrigation

NC-2009 WEc1:Water Efficient Landscaping
posted by  Dario Ibarguengoitia  on 

¿what is the IE for manual irrigation? I will use no potable water for this, I will apreciate your response cause asked about this once and did not got an answer, thank you very much

8
Thu Dec 8, 2011, 1:55 pm

Can we involve PPA's?

Schools-2009 EAc2:On-Site Renewable Energy
posted by  kerrie kannberg  on 

Is there any way to involve a PPA (Power Purchase Agreement) or similar funding mechanism for EAc2? The language in the guide is not specific, as they mention a "energy system owner".

2
Wed Dec 7, 2011, 8:28 pm

Epoxy for walls

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Erica Downs  on 

does anyone know how epoxy wall paint would be classified? simply as paint? or an architectural coating? is it even covered under LEED? thanks!

3
Sustainability Account Manager
Stok
LEEDuser Expert
177 thumbs up
Wed Dec 7, 2011, 8:27 pm

Open Space Requirement

NC-2009 SSc5.2:Site Development—Maximize Open Space
posted by  Elliot Powers, LEED AP BD+C  on 

Count me in with those frustrated with this credit language/ requirements.

2
Sustainability Specialist
Wight and Company
LEEDuser Basic Member
415 thumbs up
Wed Dec 7, 2011, 6:32 pm

No irrigation at all

CS-2009 WEc1:Water Efficient Landscaping
posted by  Yanina Ibañez  on 

Hello, in my project there will be no irrigation at all because of the adapted plants plant in all the green roofs. How do we demonstrate the achievement of the credit?

4
Tue Dec 6, 2011, 8:13 pm

POLYETHYLENE TEREPHTHALATE (PET)

Pilot-Credits PC11:Chemical Avoidance in Building Materials
posted by  Julie Hendricks  on 

I'm thinking of submitting for this pilot credit with one of my products being a type 6,6 Interface carpet tile (Tectonics).

2
President
Sage Building Revival
LEEDuser Premium Member
113 thumbs up
Tue Dec 6, 2011, 1:18 pm

timeline for investigation and analysis

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  Pablo Fortunato Suarez  on 

My clients have prepared six-sigma projects for improvement that have a timeline of 5 years (since 2006).

3
Commissioning Services Project Director
Environmental Building Strategies
LEEDuser Basic Member
14 thumbs up
Mon Dec 5, 2011, 12:49 pm