Forum quick links
Related to 62Mz Calc
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Dorilee Torres on
On the requirements of this prerequisite it says " Each air-handler must be measured; sampling or grouping of air-handlers is prohibited"; If I have three AHU's working for the same zone how can I
ID Credits 5 points
CS-2009 IDc1:Innovation in Designposted by Mike D on
Can the 3 paths be used in combination in order to achieve 5 points? I was wondering if it is possible to achieve 3 points under exemplary performance and then attempt 1 point for a pilot credit a
Hotel occupancy rate and a/c energy consumption
NC-2009 EAp2:Minimum Energy Performanceposted by Orlin Velinov, PE on
We have a hotel project with VRF systems serving the guest rooms. I am struggling with coming up with a way to simulate less than 100% occupancy rate in the hotel guest rooms.
6.2 90% Rainfall Trtmnt vs. Drainage Boundaryvs. Leed Boundary
CS-2009 SSc6.2:Stormwater Design—Quality Controlposted by Dan Wise on
Does anyone know if Drainage Areas tributary to Treatment BMPs used to atain the 90% rainafall treatment and 80% TSS removal must be contained within the LEED Boundary.
Auditors & Consistency
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Alexis Thompson on
Hello LEEDUser! I am working on a rather large building in NYC (2 million SF). They want to conduct an audit for IEQc3.2 but we are concerned about consistency.
How about using roofing material that ”eats” NOx?
NC-2009 IDc1:Innovation in Designposted by Maria Porter on
Could I apply for an ID credit for using a roofing material, (on areas where a green roof is not possible), that has titanium dioxide that neutralizes nitrogen oxides (NOx)?
Rebar
Schools-2009 MRc4:Recycled Contentposted by Nell Achtmeyer on
I have a question about tracking the recycled content for rebar.
small back-up laundry in hotel?
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Jutta Berns on
in our hotel project all laundry is outsourced to an external laundry service but we have a small area for back-up laundry requirements for the odd items that may have to be laundered.
Greywater and WEpr1 Template Calulations
CS-2009 WEp1:Water Use Reductionposted by James Keohane on
In completing the form for WEpr1, I noticed that there is no way to acknowledge/take advantage of our projects use of greywater. Oh sure WEcr2 allows us to take advabtage of greywater usage.
Skylights are included in non roof hardscape surface?
CS-2009 SSc7.1:Heat Island Effect—Nonroofposted by Alessio Zampaglione on
Hi everyone, I’m working on a project registered under LEED 2009 C&S Rating System.