DES modeling Path 2 or Path 3 under Campus Approach
NC-v4 EAp2:Minimum energy performanceposted by Anna Korinkova on
Hello everyone,
Number of Parking Spaces for EVSE in v4
Schools-NC-v4 LTc8:Green vehiclesposted by Steven Wychorski on
For v4 Schools, the BD+C Reference guide gives the formula for Alternative Fuel Fueling Stations calculation at 2%.
Example or requirements for compliant "Site Assessment".
EBOM-v4.1 SSc4:Site Managementposted by Julie Baines on
The credit language says, "Conduct a site assessment to identify and document natural areas providing habitat." This seems like something facilities folks along with landscape vendor can easily do
Inpatient floors
Healthcare-v4.1 EQc7:Daylightposted by Jennifer Atherton on
Are inpatient floors excluded from the daylight calculations? Or is the perimeter area to be determined for inpatient floors as well as non-inpatient floors and inlcude all perimete
Use of ERV for Janitorial Exhaust
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Carolyn Risley on
Knowing that in ERVs a small amount of exhaust air seeps/leaks into the supply air stream, is it possible to use an ERV to exhaust air for janitor closets, etc.
Pilot-Credits WEpc94
Pilot-Credits WEpc94:No Cooling Towerposted by Nermin Hegazy on
I have a question regarding one of the conditions to be met to achieve this credit:
Buildable land
NC-v4 LTc4:Surrounding density and diverse usesposted by Filippo Weber on
According to LTc4 – Surrounding density and diverse uses, I would like to ask for a clarification regarding the definition of “Buildable land”.
Commingled Waste approach in storage locations for recyclable materials
EBOM-v4.1 MRp3:Waste Performanceposted by Maysoon Al-Khuraissat on
I'm working on a huge existing Mall, Is the commingled waste approach accepted in LEED V4.1 for the Waste Performance prerequisite?
Considering Percent of Occupants for Kitchen Faucet in Hotel/Restaurant
NC-v4 WEc2:Indoor water use reductionposted by Priscilla Joseph on
I wanted to know if the percent of occupants can be reduced to reflect that only employees use the Kitchen Faucet and not visitors.
Certification system for the Baseline project
CS-v4 EAp2:Minimum energy performanceposted by Vassil Vassilev on
Greetings,
The energy source of the project we are modeling is electricity only.