Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Retail Displays and Fixtures

CI-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Kathy Mann  on 

I am a newbie to this forum and am working on my first LEED accreditted project so please bear with me if I ask a few remedial questions!

4
LEED Admin
CallisonRTKL
LEEDuser Basic Member
0 thumbs up
Thu Jun 7, 2012, 8:47 pm

IEQp1: ASHRAE 62.1 vs Local Code

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Caitlin Levitsky  on 

Some states and major metropolitan areas have their own local codes.

2
Director of Operations
Transwestern Sustainability Services
LEEDuser Basic Member
355 thumbs up
Thu Jun 7, 2012, 5:41 pm

Shower Access

CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Matthew Macko  on 

I have a dental office project located in a residential condo tower. There is a health/fitness club in this tower that has showers located in them.

2
Sustainability Specialist
Wight and Company
LEEDuser Basic Member
415 thumbs up
Thu Jun 7, 2012, 3:54 pm

Individaul Project vs Campus compliance

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Erin Holdenried  on 

We have a project on a campus that is using the master site for some of the credits, but not SSc4.2. We are only designing two of the bldgs being certified.

3
Default Avatar
Sustainability Architect
LEEDuser Basic Member
88 thumbs up
Thu Jun 7, 2012, 3:05 pm

Approaching SSc4.2 w/ Alt Compliance Using LEED Retail Guidance

CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Taylor Ralph  on 

Has anyone had any success approaching this credit using the Retail requirements--where it is only required to provide lockable changing rooms? There may be a CIR related to a similar attempt/appr

3
President
REAL Building Consultants
LEEDuser Premium Member
27 thumbs up
Thu Jun 7, 2012, 3:02 pm

C&S project

CS-2009 EAp2:Minimum Energy Performance
posted by  Ron Dean  on 

Hello, i am modeling a C&S project- building of 22 floors. clime type:2A .

3
Default Avatar
Sumac Inc.
LEEDuser Basic Member
20 thumbs up
Thu Jun 7, 2012, 2:59 pm

MRc4 Exemplary Performance Threshold

EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lamps
posted by  matthew strong  on 

Can anyone tell me where the 50 pg/l-h threshold for exemplary performance came from?

4
Thu Jun 7, 2012, 7:00 am

PV Array Energy model calc.

NC-2009 EAc2:On-Site Renewable Energy
posted by  Ken Scalf  on 

Hi, I'm working on a project where the owner has interest in adding a roof mounted PV system that is connected to the facility and the grid in the LEED project/boundary and in the associated constr

3
Default Avatar
Architect
Optimized Design Solutions
LEEDuser Basic Member
4 thumbs up
Wed Jun 6, 2012, 5:46 pm

Alternative compliance

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Angela Saggin  on 

Hi! We're working to certificate a multifamiliar building in Brazil and we're having a lot of trouble in finding someone to run the blower door test for us.

3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Jun 6, 2012, 5:10 pm

Enhanced Commissioning for a VRF small system

NC-2009 EAc3:Enhanced Commissioning
posted by  J.R. Anderson  on 

When uploading the detail information collected for the enhanced commissioning the details the LEED reference material referenced in the 2009 fundamentals section (step 9) spells out items that are

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Wed Jun 6, 2012, 4:04 pm