Forum quick links
Template link to Tier III pesticides not sufficient
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Geoffrey Tomlinson on
FYI, We were just denied the IPM credit using the LEEDuser template because it only included a link to the City of San Francisco’s Hazard Tier 3 least-toxic pesticides.
Parking Capacity
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by VITAL DAFNE on
I am working on a hotel with two separate buildings. Since the parking will be used for the same hotel, the local zoning requirements were met.
Energy Performance after LEED Award
NC-2009 EAp2:Minimum Energy Performanceposted by Steven Er on
In MPR, all LEED certified project must commit to sharing with USGBC and/or GBCI all available actual whole-project energy data for a period of a least 5 year. I assume building energy performance
Rapidly Renewable Lubricants
NC-2009 MRc6:Rapidly Renewable Materialsposted by Mike Woodfall on
How does a supplier of elevator hydraulic fluids document and communicate the renewable nature of our products to contractors interested in NC2009 MRc6 credits?
ESC PLAN Language
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Esteban Undurraga on
Dear all, I think this question will be useful for people doing LEED outside the US.. Is it posible to upload the ESC plan in SPANISH? or I have to translate the whole document to English??
U-factor residential/nonresidential
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
I’m modeling a hotel (5 storey, one floor is underground) in which there are also offices, a coffee bar, a wellness center...
policy wording
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Jutta Berns on
our review just came back and the reviewers made the following comment: "The economic assessment policy is incomplete, as it does not require that maintenance cost savings be included in the econ
IEQc1_Densely and Nondensely Occupied Spaces
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by susan eguia on
Hi, How do we define nondensely spaces? To satisfy LEED requirements for this credit, do we really need to install CO2 sensors for densely and OA Measurement Device for nondensely?
Adjustable flush Valve Calculations
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Chris Stigler on
We are working on a large building pursuing EBOM certification.
Project Area
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Dominique Arrieta on
Hello, we have recently realized that our project gross area was one number, and the energy model done by our engineer did not include an atrium space in the middle of the project (project is on 3r