Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Car wash service

NC-2009 IDc1:Innovation in Design
posted by  Guillermo T. Adamo  on 

Hi, We are working on a gas station that also includes a sector for car wash service. Water used for this activity is continuously recycled and reused.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Jun 29, 2012, 9:45 pm

Existing building constructions with new data center

NC-2009 EAp2:Minimum Energy Performance
posted by  Ross Farris  on 

Hello, I am going to be modeling an existing building for 2009 NC and we are adding a large data center to an interior space on the top floor of this building.

2
Energy Analyst
Glumac
LEEDuser Basic Member
3 thumbs up
Fri Jun 29, 2012, 6:02 am

Wood Casework for laboratory

NC-2009 MRc7:Certified Wood
posted by  Eri Spaulding  on 

I have wood caseworks with bamboo veneer on it which are specified under Div. 11. I assume since this is under Div.

2
Architect / Sustainability Strategist
Perkins+Will
LEEDuser Basic Member
161 thumbs up
Thu Jun 28, 2012, 8:42 pm

Occupied space-

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Greengrade User  on 

Is the gymnasium and kitchen in a school considered a regularly occupied space?

2
Thu Jun 28, 2012, 1:02 pm

FTE vs ASHRAE 62.1 occupancy

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Edwin Wealend  on 

Hi All For a C&S project there are default FTE occupancy figures that shoudl be used for water calcs, bicycle racks etc where the final occupancy is not known.

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Thu Jun 28, 2012, 9:49 am

CHP system

NC-2009 EAp2:Minimum Energy Performance
posted by  Tarek Dalati  on 

in the project we are modelling, hot water system is preheated from the building power generators by using recovery system isntalled on the genertars ( same principle of the recovery chillers) but

12
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jun 27, 2012, 8:06 pm

alternative NFRC test

NC-2009 EAp2:Minimum Energy Performance
posted by  Jae Yong Park  on 

hello as my project is outside of U.S, getting certification of NFRC is very difficult. in this contry has a similar test certification that comply with ASTM and this conutry reconized BUT it is no

3
Default Avatar
Sustainbility manager
CRHI
LEEDuser Basic Member
70 thumbs up
Wed Jun 27, 2012, 6:31 pm

movable furniture not in scope of credit

CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spaces
posted by  Tristan Roberts  on 

I was reviewing the LEED addenda and noticed an interesting one for this credit.

6
Wed Jun 27, 2012, 5:55 pm

baseline systems

NC-2009 EAp2:Minimum Energy Performance
posted by  Tarek Dalati  on 

I m modeling a 52 floor building and 2 detached retails buildings,The proposes system are chilled water system with FCU except : 1-8 floors core and shell ( m0re than 78000 sqft) 2- G+2floors

7
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jun 27, 2012, 1:57 pm

Number of preferred spaces

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Craig Flandermeyer  on 

I am pursuing option 1, preferred parking, for a building on a campus. The new parking lot expands an existing parking lot for an adjacent building.

4
Tue Jun 26, 2012, 8:49 pm