Forum quick links
Sheetrock Joint Compound and Sheetrock Tape
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Craig Phillips on
Which IEQ credit will it be for Sheetrock Joint Compound and Sheetrock Tape?
Centralized Storage Area
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Kenneth Bailey on
Our project is a campus of buildings in a remote, isolated hotel resort. Employees live within the LEED boundary. We will have a centralized storage area within the LEED boundary.
Drain Water Tempering
Schools-2009 WEc4:Process water use reductionposted by Suzanne Painter-Supplee, LEED AP+ID&C on
Some locales require drain water temp to be under 110 degrees. A commercial dishwasher may expel water up to 150 degrees--higher if drained right away, all tanks at once.
Absorption well somewhere else
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Jorge Lopez de Obeso on
Hi there! Our project located in Guadalajara-Mx is applying for EP on SScr2. After few tests on site, we detected that the terrain doesn´t have any capacity of infiltration.
No tenants?
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Sara Neff on
I am confused on how to document the floorplan requirement for this prerequisite.
ID credits in CI project
CI-2009 IDc1:Innovation in Designposted by Seonhee Kim on
I received review comments from GBCI related to ID credits and it said "Only a program specific to the LEED CI project can be considered for an ID credit." and also "A program applied to the entire
Seawater Desalination -Non potable water source for Irrigation?
Schools-2009 WEc1:Water Efficient Landscapingposted by Ameet AA on
Water Efficient Landscaping- 50% reduction Landscape water for the project in middle east, where water is scarce is to be supplied by (municipality) Seawater Desalination plant far away from the si
Option 3 requirements
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Kris Callori on
Does anyone know if there are requirements under Option 3 regarding time of day or time of year to take the daylight measurements?
Designated SMOKING AREAS...
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Matthew O'Brien on
I have come CLOSE to seeing what I need, but not exactly. Our Prelim Review Report did not pass our submittal citing "we showed the 25' boundries",,,,but NOT the area where smoking IS allowed.
Temporarily empty building
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Frantisek Macholda on
Hello, we have an office building in Slovakia that was occupied by one tenant till this summer.