Forum quick links
Federal Land- Landfill Remediation at School Site
Schools-2009 SSp2:Environmental Site Assessmentposted by Jason Ridings on
We are constructing a new school on a U.S. Army base.
Ventilation Systems Designer
NC-2009 IEQp1:Minimum IAQ Performanceposted by Henrique Mendes on
We are working on a small building, and it will have only one small HVAC split system.
Wall Base-Flooring EQ4.3 included
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Melissa Decatur on
Should the wall base material be included in the EQ4.3 credit for Flooring or is it only for resilient, stone, and carpet?
Include portable equipment?
EBOM-2009 EAp3:Fundamental Refrigerant Managementposted by Jessica Hawley on
Comments below say portable equipment that is not base building (but with greater than 0.5 pounds of refrigerant) can be excluded from this prerequisite, but the FAQ section reads: "Yes, small app
Title 22 as an alternative compliance path?
Schools-2009 SSp2:Environmental Site Assessmentposted by Megan Dougherty on
We are building a new classroom building on an existing school site.
tenant pursuing LEED certification
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Melissa Merryweather on
This seems obvious but I am humoring my client: If the main tenant is submitting for LEED CI can the Core & Shell owner just make tenant guidelines for the other two small tenants in their buil
Period of Manufacture
CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seatingposted by Stantec BG+LU FW on
My apologies for the repetitiveness of this question; I have reviewed the comments posted to date and it is still not clear to me: I am using LEED CI V.1, 2009, and am struggling with the period o
is it some kind of catch-22 or am I misled?
EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additionsposted by Fareed Alghimlas on
Since MR3 and MR9 require facility alterations and additions take place under the specific LEED definition, does this require that the IAQ Management Plan developed for IEQ1.5 must be implemented,
CO2 sensors in mechanically and naturally ventilated spaces?
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Tatiana Machado on
I have a non-densely occupied space with a mechanical ventilation system and with operable windows (natural ventilation system). According to the diagram above: all natural ventilated spaces and on
Back of House Employee Breakroom
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Angie Allen on
We are working on a hotel project and I have one question regarding the fixture family classification for faucets.