Modeling radiant heating/cooling systems

NC-2009 EAc1:Optimize Energy Performance
posted by  Petra Hajná  on 

Hi everybody. I'm working on a project in Central Europe and our team suggests implementing thermal active concrete structure to our design (heating/cooling pipes are integrated into a loadbearing

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Sep 19, 2012, 8:22 am

Low Mercury Lamps - ID Credit

EBOM-2009 MRc4:Sustainable Purchasing—Reduced Mercury in Lamps
posted by  Sheela I  on 

Do all the lamps have to be Low mercury? in order to achieve this credit?

4
Principal
Ackerstein Sustainability, LLC
LEEDuser Expert
545 thumbs up
Tue Sep 18, 2012, 10:49 pm

District Heating and Cooling Distribution Problems

NC-2009 EAc1:Optimize Energy Performance
posted by  Dawn Kowalik  on 

The project is such that it consists of two major renovations of two college buildings and the construction of a new link between them. The energy model is just of ONE building.

5
Default Avatar
Administrative Assistant
Bergmann Associates
LEEDuser Basic Member
5 thumbs up
Tue Sep 18, 2012, 9:15 pm

Non-recyclable Debris

CI-2009 MRc2:Construction Waste Management
posted by  Alejandra Feliciano  on 

Hello, We have a CI project undergoing demolition where we needed to excavate under an existing concrete slab. After the slab was removed, we found 'garbage' under the slab.

3
Tue Sep 18, 2012, 7:02 pm

Conditioned spaces - Heated & Cooled??

NC-2009 EAp2:Minimum Energy Performance
posted by  Maya Karkour  on 

Dear all, Appendix G states the following: "All conditioned spaces in the proposed design shall be simulated as being both heated and cooled even if no heating or cooling system is to be installe

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Tue Sep 18, 2012, 3:27 pm

LEED Default Recycled Content for Steel

NC-2009 MRc4:Recycled Content
posted by  Abdulrahman Sherazy  on 

Hello friends, what if I got the real recycled content from a supplier of steel and it was less than 25%, can I use the LEED default value then? Is there a limitation for using this exception?

3
Environmental Business Development- LEED AP BD&C
Nucor Corporation
LEEDuser Basic Member
132 thumbs up
Tue Sep 18, 2012, 5:51 am

Facade along the Sidewalk

Pilot-Credits PC14:Walkable Streets
posted by  Candace Small  on 

I am looking for guidance on the following credit requirement: “If a façade extends along a sidewalk, no more than 40% of its length or 50 feet (15 meters), whichever is less, is blank (without do

3
Mon Sep 17, 2012, 9:43 pm

Option 4-Vehicle Sharing Program-Only cars for 8 comply?

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Brooks Critchfield  on 

The credit criteria for Option 4 clearly states that one LE/FE vehicle must be provided per 3% of the FTE . . .

2
Mon Sep 17, 2012, 8:59 pm

"Special" coating requirements for recycled content GWB.

NC-2009 MRc4:Recycled Content
posted by  Charles Fritzemeier  on 

I have a situation where our client is very concerned that GWB with recycled content needs to be specially sealed in order to maintain a healthy environment.

3
Mon Sep 17, 2012, 7:36 pm

The same CxA overseeing EAc3 tasks must ALSO oversee EAp1?

NC-2009 EAc3:Enhanced Commissioning
posted by  Brooks Critchfield  on 

Footnote #4 on page 221 of the LEED-NC v2009 Reference Guide expressly notes that "The same CxA overseeing the enhanced commissioning tasks must also oversee the fundamental commissioning tasks."

4