Forum quick links
What about on-site renewable energy, factored or not?
Schools-2009 EAc6:Green Powerposted by Keelan Kaiser on
If we have some on-site renewable energy (pv and wind), does it get calculated for a net energy use, or does this credit restrict to the total gross baseline amount calculated by the energy model (
Leasing agreement
CS-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Michael E. Edmonds-Bauer on
Does the MER13 need to be requested to future tenants by a leasing agreement?
FTE for a Barracks
NC-2009 PIf3:Occupant and Usage Dataposted by Christopher Sawyer on
My project is a military barracks for 650 cadets on a campus.
zip code
NC-2009 PIf2:Project Summary Detailsposted by charles bell on
I can't change the zip code on PI f2. Is this linked to some other form?
ECS - Other clg Accessories under Primary Cooling
NC-2009 EAp2:Minimum Energy Performanceposted by Ivy Chen on
We would like to find out what have been included in item "Other Clg Accessories" under Primary Cooling in Energy Consumption Summary. In our baseline, Package Terminal Heat Pump is adopted.
9.4.1.1 mandatories for CS
CS-2009 EAp2:Minimum Energy Performanceposted by Katherine Ann Resurreccion on
Hi everyone! If the project base building scope does not include the lighting fixtures for tenant spaces but wiring stub-outs are, do we still need to have the automatic control device for the "bu
Water Use Threshold for Credit Eligibility
Pilot-Credits WEpc18:Appliance and process water use reductionposted by Adam Shelly on
There should be some sort of water use threshold that the project needs to exceed in order to be eligible for the credit.
FSC Mixed vs FSC Recycle on Invoices?
NC-2009 MRc7:Certified Woodposted by John Casciato on
If my invoice says FSC Mixed for an MDF order, even tough MDF is a recycle product by design, would that go towards MRc4 instead of MRc7 even if the invoice says FSC Mixed?
Does 62MZ calculations needed?
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Dorilee Torres on
I am working with a facility to determine if they can meet the prerequisite for the LEED EBOM. Currently the facility has 12 AHU's, some of them working for the same single space.
FSC assembly requirement for LEED
NC-2009 MRc7:Certified Woodposted by Paul Setzer on
Per LEED requirements, woodworkers now have to be FSC certified in order to qualify for the MRc7 point contribution.