Colorants added at the Point-of-Sale

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Laurent Kanago  on 

This is in reference to Green Seal GS-11 section 4.4 and 4.5. I am working on a project that is looking to use Dryfall Paint. the Flat paints meet the

2
Thu Dec 27, 2012, 5:56 pm

What is a "view factor?"

CS-2009 IEQc8.2:Daylight and Views—Views
posted by  Lauren Ulmer  on 

In the Reference Guide, under Exemplary Performance for this credit, item #4 mentions a "view factor." What is that? I can't find an explanation of it in the Reference Guide or on LEED User.com.

4
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Thu Dec 27, 2012, 5:16 pm

Recycled content counted as a regional material

NC-2009 MRc5:Regional Materials
posted by  Sara Heppe  on 

I am getting conflicting information about the allowable extraction/harvesting point for recycled content in materials.

5
Founder & Community Director
Metricorps
LEEDuser Expert
7781 thumbs up
Wed Dec 26, 2012, 5:01 pm

Commissioning Walk-in Freezers / Coolers

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Richard Woodward  on 

We have a mixed use new office / commercial kitchen project with owner occupiers.

3
Fri Dec 21, 2012, 7:45 pm

Calculating Vot in Credit Template

CI-2009 IEQp1:Minimum IAQ Performance
posted by  Rick Servoss  on 

The Template calculates Vot by dividing Voz by Ev. ASHRAE 62.1 2007 arrives at Vot by dividing Vou by Ev, not Voz.

2
Default Avatar
Mechanical Engineer
LEEDuser Basic Member
23 thumbs up
Fri Dec 21, 2012, 6:54 pm

M&V Plan - Specific Acceptable Range(s) of Error

CS-2009 EAc5.1:Measurement and Verification—Base Building
posted by  Marina Andrade  on 

Hello, I just got the review comment requesting the “specific acceptable range(s) of error”, follow the comment bellow. “TECHNICAL ADVICE: Please revise the Measurement and Verification Plan, as

2
Default Avatar
Principal
G. F. Shymko & Associates Inc.
LEEDuser Basic Member
97 thumbs up
Fri Dec 21, 2012, 11:40 am

Audits Around the World

EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysis
posted by  Jenny Carney  on 

All, I'm trying to compile a list of energy audit providers outside of the US.

4
Default Avatar
Owner / Energy Engineer / Sustainability Consultant
Sustainnovations, LLC
LEEDuser Basic Member
94 thumbs up
Fri Dec 21, 2012, 12:08 am

Air cooled chillers and other air cooled equipment.

NC-2009 EAp2:Minimum Energy Performance
posted by  Rudolph Carneiro  on 

Question: If I have an air cooled chiller selected at non-ARI conditions that has a full load efficiency of 3.0 COP, does it comply with the minimum efficiency requirement of 2.8 COP from ASHRAE -

3
Thu Dec 20, 2012, 9:01 pm

Innovation points no longer recognized?

NC-2009 IDc1:Innovation in Design
posted by  Kris Phillips  on 

I have conflicting information on a few Innovation points that have been achieved on certain projects, but are apparently being denied on current projects being deemed "too easy" by the GBCI review

5
Default Avatar
Sustainable Building Services Project Manager
Architectural Energy Corporation
LEEDuser Basic Member
6 thumbs up
Thu Dec 20, 2012, 4:58 pm

Cooling and heating specification

NC-2009 EAc1:Optimize Energy Performance
posted by  Jatuwat Varodompun  on 

If my project does not have any heating system at all (but it will have cooling system), Are the baseline and proposed models required to have defualt heating system as specified in appendix G?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Thu Dec 20, 2012, 3:03 pm