Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

What about on-site renewable energy, factored or not?

Schools-2009 EAc6:Green Power
posted by  Keelan Kaiser  on 

If we have some on-site renewable energy (pv and wind), does it get calculated for a net energy use, or does this credit restrict to the total gross baseline amount calculated by the energy model (

3
Wed Dec 12, 2012, 10:02 pm

Leasing agreement

CS-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Michael E. Edmonds-Bauer  on 

Does the MER13 need to be requested to future tenants by a leasing agreement?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Wed Dec 12, 2012, 6:46 pm

FTE for a Barracks

NC-2009 PIf3:Occupant and Usage Data
posted by  Christopher Sawyer  on 

My project is a military barracks for 650 cadets on a campus.

7
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Wed Dec 12, 2012, 6:11 pm

zip code

NC-2009 PIf2:Project Summary Details
posted by  charles bell  on 

I can't change the zip code on PI f2. Is this linked to some other form?

2
Wed Dec 12, 2012, 3:30 pm

ECS - Other clg Accessories under Primary Cooling

NC-2009 EAp2:Minimum Energy Performance
posted by  Ivy Chen  on 

We would like to find out what have been included in item "Other Clg Accessories" under Primary Cooling in Energy Consumption Summary. In our baseline, Package Terminal Heat Pump is adopted.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Dec 12, 2012, 3:15 am

9.4.1.1 mandatories for CS

CS-2009 EAp2:Minimum Energy Performance
posted by  Katherine Ann Resurreccion  on 

Hi everyone! If the project base building scope does not include the lighting fixtures for tenant spaces but wiring stub-outs are, do we still need to have the automatic control device for the "bu

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Dec 11, 2012, 11:47 pm

Water Use Threshold for Credit Eligibility

Pilot-Credits WEpc18:Appliance and process water use reduction
posted by  Adam Shelly  on 

There should be some sort of water use threshold that the project needs to exceed in order to be eligible for the credit.

2
Tue Dec 11, 2012, 9:50 pm

FSC Mixed vs FSC Recycle on Invoices?

NC-2009 MRc7:Certified Wood
posted by  John Casciato  on 

If my invoice says FSC Mixed for an MDF order, even tough MDF is a recycle product by design, would that go towards MRc4 instead of MRc7 even if the invoice says FSC Mixed?

4
Default Avatar
Certified Wood Products, Inc
LEEDuser Basic Member
0 thumbs up
Tue Dec 11, 2012, 8:33 pm

Does 62MZ calculations needed?

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Dorilee Torres  on 

I am working with a facility to determine if they can meet the prerequisite for the LEED EBOM. Currently the facility has 12 AHU's, some of them working for the same single space.

3
Tue Dec 11, 2012, 7:41 pm

FSC assembly requirement for LEED

NC-2009 MRc7:Certified Wood
posted by  Paul Setzer  on 

Per LEED requirements, woodworkers now have to be FSC certified in order to qualify for the MRc7 point contribution.

3
Tue Dec 11, 2012, 6:09 pm