Hi, I know this has been discused before, but I still can´t make it.
The thing is that I have a C&S building to model.
I have assumed 35 W/m2 of other loads on all tennant spaces, which the simulation program takes as "Process Loads", other Process Loads I set as are Elevators and pumps.
The building has also Parking exhaust and injection fans, and exhaust fans for bathrooms, which are placed on the C&S portion of the building.
With these loads taken as process loads, the percentage of process loads on the baseline is just 1% of the total cost, so it does not comply with what is asked.
I have realized that C&S lighting, interior and exterior, is very high for both the project and the baseline buildings, and I think this is the reason why this porcentaje is so low. The question is:
Would it be ok to assume this C&S lighting as "Process Loads"?,
In this case, I have to say that "Process Loads" rises up to 99% of total cost.
I will appreciate any comment,
Thank you