Hi, I know this has been discused before, but I still can´t make it. The thing is that I have a C&S building to model. I have assumed 35 W/m2 of other loads on all tennant spaces, which the simulation program takes as "Process Loads", other Process Loads I set as are Elevators and pumps. The building has also Parking exhaust and injection fans, and exhaust fans for bathrooms, which are placed on the C&S portion of the building. With these loads taken as process loads, the percentage of process loads on the baseline is just 1% of the total cost, so it does not comply with what is asked. I have realized that C&S lighting, interior and exterior, is very high for both the project and the baseline buildings, and I think this is the reason why this porcentaje is so low. The question is: Would it be ok to assume this C&S lighting as "Process Loads"?, In this case, I have to say that "Process Loads" rises up to 99% of total cost. I will appreciate any comment, Thank you
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.