Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Include curbs and tops of walls? SRI of granite curb?

NC-2009 SSc7.1:Heat Island Effect—Non-Roof
posted by  Erica Downs  on 

In adding up the "paved" areas, are granite curbs (between the sidewalk and street) typically included?

3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Feb 7, 2013, 7:05 pm

Thermostat Values

CS-2009 EAp2:Minimum Energy Performance
posted by  Herman C  on 

Hello, How are the Thermostat values (Upper and Lower limit) to be selected for LEED CS please?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Feb 7, 2013, 5:40 pm

Hotel and Convention Center - Registration as One project

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Ahmad Gabir  on 

We have a hotel building (600,000 sf) and a convention center (150,000 sf) which are connected by a 300-400 feet ong corridor.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Feb 7, 2013, 4:34 pm

NC Comercial Building into a LEED ND Neighborhood (Stage 1)

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Gaston Viau  on 

Our project is located into a LEED Neighborhood Development which obtained Stage 1 certification.

3
Thu Feb 7, 2013, 3:52 pm

Hazardous Chemical Clarification

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Edward Gulick  on 

The small project I'm working on will have a small janitors closet with a mop basin, as well as a stacked washer/dryer for rags and towels.

2
Default Avatar
Senior Mechanical Designer
LEEDuser Basic Member
0 thumbs up
Wed Feb 6, 2013, 9:49 pm

Differential Pressure Measurement

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Oliver Glahn  on 

Hello, has anyone experience in conducting the differential air pressure measurement of a smoking room with respect to each adjacent vertial chase? This requirement seems very difficult to meet.

2
Default Avatar
Project Partner
Drees & Sommer Advanced Building Technologies
LEEDuser Basic Member
2 thumbs up
Wed Feb 6, 2013, 7:03 pm

buidable land

ND-v2009 SLLc6:Steep slope protection
posted by  Noriko Nagazumi  on 

Hi, Is the definition of buildable land under LEED-ND identical to the following statement quoted from http://www.ci.blaine.mn.us/index2col.cfm?id=901246? "The space remaining on a lot after the mi

7
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Wed Feb 6, 2013, 7:20 am

Can we earn this though new building

CI-2009 MRc2:Construction Waste Management
posted by  Mathilda Jonsson  on 

Hi all! I'm working on a project which seeks LEED CS for the base building and LEED CI for a companys spaces.

6
Director, Project Manager
Delos Living
LEEDuser Basic Member
0 thumbs up
Tue Feb 5, 2013, 9:43 pm

New RP threshold for EAp1?

EBOM-2009 RPc1:Regional Priority
posted by  Donna Juselis  on 

We are currently working on a project in NC (zip 27244). The regional priority threshold for EAp1 Option 1 is supposed to be 28% (new bldgs) and 24% (existing bldgs).

3
LEED Consultant
Commissioning WorCx
LEEDuser Basic Member
13 thumbs up
Tue Feb 5, 2013, 8:36 pm

What is an intersection?

ND-v2009 SLLc1:Preferred locations
posted by  Timothy Nabholz  on 

I am currently using a radii around one of our potential sites and am trying to calculate how many intersections are within that radius.

4
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Tue Feb 5, 2013, 4:35 pm