Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Bathroom Waste

EBOM-2009 MRc6:Solid Waste Management—Waste Stream Audit
posted by  Jubilee Daniels, MLA, LEED AP O+M  on 

Hi, I have a client who is concerned about going through bathroom waste and would like to earn this credit by sorting and weighing all other waste except bathroom waste.

3
Thu Mar 14, 2013, 4:22 pm

Thermal Comfort Survey and Corrective Action

Schools-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Ema S  on 

Does anyone know where I can find a thermal comfort survey and samples of plans for corrective action?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Mar 14, 2013, 12:43 am

project boundary definition

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Emmanuel Pauwels  on 

Our Project consists of land that is property of the owner.

3
Wed Mar 13, 2013, 1:33 pm

Which Parking Areas to Include?

NC-2009 PIf2:Project Summary Details
posted by  Kevin Flynn  on 

I am beginning work on a fairly complex project. The portion of the project seeking LEED certification is an office building attached to an existing building.

2
Wed Mar 13, 2013, 1:39 am

CS and CI fee relationship

NC-2009 PIf2:Project Summary Details
posted by  Melissa Merryweather  on 

I have a project where we are doing a CS certification for the building owner and a CI project for the main tenant at the same time. I was about to submit both for Preliminary Certification.

3
Wed Mar 13, 2013, 1:14 am

Certifying one LEED building on a campus

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Lisa Sawin  on 

We have currently drawn our LEED boundary to include all areas that our building/scope of work is impacting.

2
Wed Mar 13, 2013, 12:09 am

Data Centers - Efficiency for UPS and computer servers for the

NC-2009 EAp2:Minimum Energy Performance
posted by  Carlos Garcia  on 

Dear all We're working in the energetic simulation for the credit EA p 2 in LEED NC 2009 in a Data Center building.

5
Tue Mar 12, 2013, 10:08 pm

Natural Ventilation: Which spaces are to be considered?

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Marco Abdallah  on 

1. Are only regularly occupied spaces to be considered or all generally spaces (including stairs, corridors, storage and technical rooms)? 2.

4
Default Avatar
HVAC consultant
Optimized Systems
LEEDuser Basic Member
19 thumbs up
Tue Mar 12, 2013, 5:08 pm

Thermal Comfort (IEQc 7.1) for Industrial Applications

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Ismaiel Salama  on 

We are targeting this credit for a project with more than 70% of the buildings are utilised for industrial, processing, storage and manufacturing activities.

4
Tue Mar 12, 2013, 3:50 pm

Understanding how hazardous materials effect calculations

NC-2009 MRc2:Construction Waste Management
posted by  Renee Shirey  on 

Scenario: select asbestos-containing material (ACM) to be left in exist. bldg (and is allowed to be) and will be handled during demolition.

6
Mon Mar 11, 2013, 10:43 pm