Forum quick links
Building flush out for several small alterations
EBOM-2009 IEQc1.5:IAQ Best Management Practices—Facility Alterations and Additionsposted by Julie Pollack on
There will be several small building alterations completed to our project building during the performance period (vestibule and lobby upgrades, demo and tenant finish build out for entire floor, to
Simulation tool
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by VICTOR MORENO on
Hi, I make a daylight simulation with Design Builder, that provides results for IEQ 8.1 v3.
Formerly reclaimed land eligible for LEED certification?
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Elke Malleier on
I have a project on an island in South Korea.
Children Who Don't Ride Bikes But Use Restrooms
NC-2009 PIf3:Occupant and Usage Dataposted by Loretta Young, LEED AP on
We're working on a project that has a Day Care Center and a lot of Transient children.
LEED EB:OM 2009 Addenda : IEQc3.5: Green Cleaning - Entryway
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Karin Wohlert on
According to the latest Addenda the following statement, "Provide containment drains plumbed for appropriate disposal of hazardous liquid wastes in places where water and chemical concentrate mixin
Commissioning for NC Tenant Fit-outs
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Carly Ruggieri on
A project of mine is a high-rise residential building with 6 floors of commercial spaces that will be fit-out by future tenants.
Stand Alone Restroom Building
NC-2009 MPR4:Must comply with minimum floor area requirementsposted by JASON BONE on
I am currently working on a Multiple Building Application for LEED and we have a stand alone restroom building that serves the playfield.
Template rounding for Design Case-Urinal
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Rebekah Burke on
We have completed our template with all fixtures included and are at 39.97% savings!!! UGH.
Modeling Context
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Marzia Sedino on
Hi, For credit compliance, under OPTION 1 - Simulation, is it required to model the building context (e.g. neighboring buildings/obstructions)?
Regular Occupied Spaces
NC-2009 PIf3:Occupant and Usage Dataposted by Tanja Arnesson on
Hi, I'm working on a LEED NC project in Sweden where we are building a large building that contains a large concert and congress hall as well as a hotel.