Forum quick links
Compressed Natural Gas Excavation Equipment
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Janna Nash on
Can anyone tell me if there is a LEED NC credit that would "reward" a project for using Compressed Natural Gas in excavation and other construction equipment?
LEED AP Consultant Fee
EBOM-2009 IOc2:LEED Accredited Professionalposted by Rodney Berry on
I am currently working on a project in conjunction with my MBA studies regarding LEED EB certification.
Cradle to cradle certificate as ACP?
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Isolda Strom on
Dear All, I am working on a LEED project in Europe. Our architect is applying several products with Cradle to cradle certificates.
Mandatory provisions for a heat pump
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
I have to model a heat pump that outside the building exchanges heat with the external air and it exchanges heat with the building, i.e. with the internal part of the HVAC plant, thorough water.
Water Efficient landscaping - finding the ETo
NC-2009 WEc1:Water Efficient Landscapingposted by Robert Thomas, CPD, LEED AP BD+C on
How can I find the evapotranspirtaion rate, ETo, for various plants in various regions, and can this be found on LEEDuser's website?
Mechanical plans ando/or drawings
NC-2009 PIf4:Schedule and Overview Documentsposted by JOSE R. TAGLE on
Hello, I'm on a New Construction project and Preform4 asks for Mechanical plans and/or drawings, i'm not sure if these refer to HVAC plans only, or if it includes other plans such as MEP ones (HVAC
How many credit points does one get by offsetting 7%.
CS-2009 EAc2:On-site Renewable Energyposted by Tuana Papile on
By using on-site renewable energy for 7% of the total energy, do we get now 7 points compared to the 4 points for NC? Thank you
Control of verhead lighting through VOIP phone integration
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Saju Varghese on
Would VOIP phone integration lighting controllability of individual workstations (in open offices) count towards the credit, instead of using task lighting?
Glazing Sealant / Adhesive
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Catherine Blakemore on
Does a glazing sealant get logged under the structural glazing adhesive category? Or should it be logged under Interior Sealants - Architectural?
Additions
Healthcare-v2009 IEQp3:Hazardous material removal or encapsulation (renovations only)posted by Catherine Blakemore on
Our project is an Addition to an existing structure. The LEED boundary for the project is just the addition and does not include any of the existing building.