Forum quick links
Change of tenant
NC-2009 PIf2:Project Summary Detailsposted by Antonio Rodriguez on
I am working in a CS project, which was registered under the future tenant's name, and has already achieved pre-certification.
Green Power purchase after first review (out of the performance)
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Patricia Fuertes on
We have already submitted the certification and we have received the return review, at this point we need to activate some more points in order to reach de 40 points for the certification.
If some facades meet ASHRAE 90.1, but others don't....
CS-2009 EAp2:Minimum Energy Performanceposted by Amit Ahiel on
....does the project meet ASHRAE 90.1's Mandatory Provisions and therefore this Prerequisite? Our project has complicated set of facades with different curtain-wall patterns and types of glass.
Facilities for Rent
Schools-2009 SSc10:Joint Use of Facilitiesposted by PAULA HIDALGO on
Is allowable in terms of the credit requirements that the university project that I'm working with rents facilities to the community?
Solar subsidy vs grant
NC-2009 EAp2:Minimum Energy Performanceposted by Tyra Sorensen on
We have a project that received a large grant from the state to put on Solar panels.
Existing sidewalk inclusion?
Pilot-Credits PC14:Walkable Streetsposted by emily reese moody on
Hi, I would like to attempt this credit for several of my current and future LEED projects.
Case 1, Option 2. I must be
CS-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Robert Barrett on
Case 1, Option 2. I must be reading/interpreting this wrong.
Rainwater use applicable for non-Retail/Healthcare projects?
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Timothy Casper on
The USGBC document, "Water Use Reduction Additional Guidance" states, "Retail and Healthcare projects may apply on-site non-potable water sources for fixtures and process water use reduction." Doe
Exterior Lighting Power for Non-Tradable Surfaces
NC-2009 EAc1:Optimize Energy Performanceposted by Kai Andrade on
This question is about the modeling the exterior lighting in accordance with ASHRAE 90.1-2007.
Actual maximum demand load, and the simulation result
NC-2009 EAc2:On-Site Renewable Energyposted by Radwa Amin on
Hello, Our project has two sources of energy (electricity, and natural gas). We have already finished the simulation model, and its result was accepted by USGBC, when reviewed.