Forum quick links
Regional Material Tracking with Multiple Forms of Transportation
NC-2009 MRc5:Regional Materialsposted by Karleigh Pihowich on
I have a material that was extracted 425 km from the manufacture point and transported by truck. After manufacture the material was shipped via rail to the project site which is 2076 km.
Demolition implemented by separate contractor
CS-2009 MRc2:Construction Waste Managementposted by Morteza Kasmaei on
This CS project is a major renovation to an existing building and has separate contractors for demolition and major construction.
Two methods: T-stats and windows in the same project?
CS-2009 IEQc6:Controllability of Systems—Thermal Comfortposted by Diana Nezamutinova on
Would a mechanically ventilated building be able to rely on 2 methods for documenting compliance: T-stats and windows? Some occupants will use one, while the others will rely on another.
SSc7.2 Weighted Average Calculator
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Gabriel Moreno on
Apologies if this question has already been answered - but I've searched as thoroughly as possible and did not find a satisfiable explanation. I am running a simple test with the following values;
Kitchen Efficient Equipments
NC-2009 EAp2:Minimum Energy Performanceposted by Marina Andrade on
Hi! How can i gain points in my simulation with kitchen equipments? I'm working on a project that has automation and i don't know how can i indicate this. I think all kitchen equipments will be
Occupancy Sensor and/or Decorative lighting credit
CI-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
Could occupancy sensor credit under G.3.2 be used towards meeting the 10% lighting savings requirement? Could credit for decorative lighting be implemented as well 9.6.2a?
ATM Machine
NC-2009 SSc2:Development Density and Community Connectivityposted by Wei Jiang on
Would anyone consider ATM machine as one of the basic services (Banks), for Option 2 - community connectivity?
Rainwater storage system
EBOM-2009 WEc3:Water Efficient Landscapingposted by Karin Wohlert on
I'm looking for a calculator or guide that would suggest how much rainwater could be collected in Mid-summer or the month with the highest irrigation demand.
Predominant spaces determined by square footage or hours of use?
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Scott on
I have a roughly 48,000 sf church with the following breakdown by area and hours of use: 1st Floor: 4,100 sf Multipurpose Space used 16 hours per week 8,200 sf Common Space used 72 hours per week
Recertification
CI-2009 PIf5:Previously LEED Certified Detailsposted by David Wood on
Good morning, I had a question about recertification. My building is currently certified under V2.0 and we are up for recertification in 2015. We recieved certification in 2010.