Combined metering for plug loads and lighting
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Rudolph Carneiro on
I am having lots of trouble with design teams in getting them to seperate internal lighting circuitry from plug loads.
rainwater harvesting ACP for non-healthcare/retail projects
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Michael Maier on
The Water Use Reduction - Additional Guidance document seems to indicate that although on-site non-potable water sources for flush fixtures and/or flow fixtures (i.e.
Existing Fixtures
NC-2009 WEc3:Water Use Reductionposted by ERIC TAYLOR on
Do I have to account for the water use of existing fixtures to remain on a major renovation (football stadium) under LEED NC, if they are within the LEED boundary, but the spaces/structures they ar
Who is the Commissioning Authority?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Heather Holdridge on
We have one firm performing fundamental Cx services and another firm performing enhanced Cx services. Which consultant would be designated the "commissioning authority?"
Signatories
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Michelle Rosenberger on
With LEED 2009 came mandatory online signatories for Owner, CxA, Contractor, etc.
Innitial ?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Eric JS on
Dear all, In some credits, including in CxA credit, there are initial of CxA or other parties are required.
EAp1 Review
NC-2009 EAp2:Minimum Energy Performanceposted by Jorge Lopez de Obeso on
Hello we´ve submitted a project to review in which we have no conditioned spaces in the proposed case but we modelled the HVAC system the same way in baseline and proposed cases since we dont compl
Smoking shelters
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Julie Pollack on
When researching this credit, I found info stating that when using Option 1, the building owner should provide a smoking shelter. Is this true?
Modeling HVAC System #8: VAV with PFP boxes
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Rodriguez on
Dear Forum, We are modeling a high rise building in order to comply with EAp2 minimum energy performance.
Fume Hood Testing ASHRAE 110 & ECARO
NC-2009 IDc1:Innovation in Designposted by Tze Higby on
This is a new built Laboratory/Manufacturing buiding.