Combined metering for plug loads and lighting

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Rudolph Carneiro  on 

I am having lots of trouble with design teams in getting them to seperate internal lighting circuitry from plug loads.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Oct 24, 2013, 11:28 pm

rainwater harvesting ACP for non-healthcare/retail projects

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Michael Maier  on 

The Water Use Reduction - Additional Guidance document seems to indicate that although on-site non-potable water sources for flush fixtures and/or flow fixtures (i.e.

3
Default Avatar
Leroy Street Studio
LEEDuser Basic Member
0 thumbs up
Thu Oct 24, 2013, 10:57 pm

Existing Fixtures

NC-2009 WEc3:Water Use Reduction
posted by  ERIC TAYLOR  on 

Do I have to account for the water use of existing fixtures to remain on a major renovation (football stadium) under LEED NC, if they are within the LEED boundary, but the spaces/structures they ar

2
Default Avatar
Project Coordinator
Karpinski Engineering
LEEDuser Premium Member
0 thumbs up
Thu Oct 24, 2013, 8:30 pm

Who is the Commissioning Authority?

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Heather Holdridge  on 

We have one firm performing fundamental Cx services and another firm performing enhanced Cx services. Which consultant would be designated the "commissioning authority?"

3
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Thu Oct 24, 2013, 4:03 pm

Signatories

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Michelle Rosenberger  on 

With LEED 2009 came mandatory online signatories for Owner, CxA, Contractor, etc.

4
Architect
PF&A Design
LEEDuser Basic Member
11 thumbs up
Wed Oct 23, 2013, 11:44 pm

Innitial ?

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Eric JS   on 

Dear all, In some credits, including in CxA credit, there are initial of CxA or other parties are required.

3
Architect
PF&A Design
LEEDuser Basic Member
11 thumbs up
Wed Oct 23, 2013, 11:38 pm

EAp1 Review

NC-2009 EAp2:Minimum Energy Performance
posted by  Jorge Lopez de Obeso  on 

Hello we´ve submitted a project to review in which we have no conditioned spaces in the proposed case but we modelled the HVAC system the same way in baseline and proposed cases since we dont compl

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Oct 23, 2013, 9:09 pm

Smoking shelters

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Julie Pollack  on 

When researching this credit, I found info stating that when using Option 1, the building owner should provide a smoking shelter. Is this true?

3
Co-Founder/Principal
Stewart-Pollack Design Associates
LEEDuser Basic Member
2 thumbs up
Wed Oct 23, 2013, 6:14 pm

Modeling HVAC System #8: VAV with PFP boxes

NC-2009 EAp2:Minimum Energy Performance
posted by  Santiago Rodriguez  on 

Dear Forum, We are modeling a high rise building in order to comply with EAp2 minimum energy performance.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Oct 22, 2013, 10:04 pm

Fume Hood Testing ASHRAE 110 & ECARO

NC-2009 IDc1:Innovation in Design
posted by  Tze Higby  on 

This is a new built Laboratory/Manufacturing buiding.

2
Tue Oct 22, 2013, 5:30 pm