wood with recycled content

NC-2009 MRc7:Certified Wood
posted by  Benjie Herrera  on 

If the wood purchased has 20%recycled content (which will go to MR Cr4 Recycled Content), will that mean that 80% non-recycled content of the value must be reported in the MR cr 7 Certified Wood ?

4
Principal
Jason Grant Consulting
LEEDuser Expert
115 thumbs up
Fri Nov 1, 2013, 3:29 pm

Pilot Credit vs EAc5

Pilot-Credits PC27:Reconcile Designed and Actual Energy Performance
posted by  Sara Goenner Curlee  on 

I am working on a LEED NCv2.2 academic building which has completed its EAc5 Measurement and Verification effort. I am trying to understand how EAc5 and the pilot credit differ.

3
Sustainability Manager and Architect
Pope Design Group
LEEDuser Basic Member
47 thumbs up
Fri Nov 1, 2013, 2:27 pm

RE: Wellness Room in Office Building

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Chris Miller  on 

My office project has a "Wellness" room whcih includes a lav faucet & toilet.

5
Thu Oct 31, 2013, 8:42 pm

Adjunct Professors Room

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Saju Varghese  on 

Hi, In one of our project we have a room designated for 6 adjunct professors to work/study/rest.

4
Thu Oct 31, 2013, 4:47 pm

Wood Flooring

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Mariah Grife  on 

I am on aproject that is installing some savage wood flooring panels that were removed and saved during demo.

4
Default Avatar
Walsh Construction
LEEDuser Basic Member
6 thumbs up
Thu Oct 31, 2013, 3:43 pm

Case 1 Central Plant Cooling

CI-2009 EAc3:Measurement and Verification
posted by  sompoche sirichote  on 

Under Case 1, we got comments from the reviewer as follows: "Case 1 - Lease The LEED Credit Form has been provided stating that the project occupies 1.2% of the base building and therefore applies

4
Thu Oct 31, 2013, 3:39 pm

M&V option D. certification timing

NC-2009 EAc5:Measurement and Verification
posted by  Alex Parella  on 

When using Option D, should we wait till the end of the 1 year monitoring to obtain the credit and, therefore, the final building certification?

4
Default Avatar
HVAC consultant
Optimized Systems
LEEDuser Basic Member
19 thumbs up
Wed Oct 30, 2013, 10:38 pm

2 questions...

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Courtney Royal  on 

First, on the credit form, even tho flooring such as tile, terrazzo, stone, do not require any IAQ testing, etc., do you still need to enter them on the credit form?

6
Sr. Sustainability Consultant
Taitem Engineering
LEEDuser Basic Member
36 thumbs up
Wed Oct 30, 2013, 5:52 pm

Extraction/Manufacture within 500 miles

NC-2009 MRc5:Regional Materials
posted by  Mariah Grife  on 

I have a letter from the supplier for Timber that it is both manufactured and extracted within 500 miles, but does not list a specific location or zip code.

2
Default Avatar
Walsh Construction
LEEDuser Basic Member
6 thumbs up
Wed Oct 30, 2013, 4:40 pm
5
LEED Green Associate
GGO Architects
LEEDuser Basic Member
1 thumbs up
Wed Oct 30, 2013, 8:47 am