Forum quick links
wood with recycled content
NC-2009 MRc7:Certified Woodposted by Benjie Herrera on
If the wood purchased has 20%recycled content (which will go to MR Cr4 Recycled Content), will that mean that 80% non-recycled content of the value must be reported in the MR cr 7 Certified Wood ?
Pilot Credit vs EAc5
Pilot-Credits PC27:Reconcile Designed and Actual Energy Performanceposted by Sara Goenner Curlee on
I am working on a LEED NCv2.2 academic building which has completed its EAc5 Measurement and Verification effort. I am trying to understand how EAc5 and the pilot credit differ.
RE: Wellness Room in Office Building
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Chris Miller on
My office project has a "Wellness" room whcih includes a lav faucet & toilet.
Adjunct Professors Room
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Saju Varghese on
Hi, In one of our project we have a room designated for 6 adjunct professors to work/study/rest.
Wood Flooring
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Mariah Grife on
I am on aproject that is installing some savage wood flooring panels that were removed and saved during demo.
Case 1 Central Plant Cooling
CI-2009 EAc3:Measurement and Verificationposted by sompoche sirichote on
Under Case 1, we got comments from the reviewer as follows: "Case 1 - Lease The LEED Credit Form has been provided stating that the project occupies 1.2% of the base building and therefore applies
M&V option D. certification timing
NC-2009 EAc5:Measurement and Verificationposted by Alex Parella on
When using Option D, should we wait till the end of the 1 year monitoring to obtain the credit and, therefore, the final building certification?
2 questions...
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Courtney Royal on
First, on the credit form, even tho flooring such as tile, terrazzo, stone, do not require any IAQ testing, etc., do you still need to enter them on the credit form?
Extraction/Manufacture within 500 miles
NC-2009 MRc5:Regional Materialsposted by Mariah Grife on
I have a letter from the supplier for Timber that it is both manufactured and extracted within 500 miles, but does not list a specific location or zip code.
ID Credit for Occupant Wellness
NC-2009 IDc1:Innovation in Designposted by Sara Zoumbaris on
Hi All!