Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Green Cleaning - referencing LEED EB

NC-2009 IDc1:Innovation in Design
posted by  Carrie Laurendine  on 

Apparently LEED-NC projects seeking green cleaning ID credit should reference LEED-EB green cleaning requirements.

3
Mon Jan 13, 2014, 8:30 pm

use of green power during construction

NC-2009 IDc1:Innovation in Design
posted by  Charles Winkler  on 

Does anyone know whether I can obtain an Innovation Credit for use of green power during construction? I have a 15,000 sf New Construction project.

3
Default Avatar
MEP Department Head
KHAFRA
LEEDuser Basic Member
0 thumbs up
Mon Jan 13, 2014, 5:19 pm

Campus PV PPA

NC-2009 EAc2:On-Site Renewable Energy
posted by  Chad Coleman  on 

I am hoping that someone can shed some light on the way a Campus PV PPA will be viewed for EAc1 and EAc2 in LEED NCv2009.

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Jan 13, 2014, 4:28 pm

ASHRAE 90.1-2007 - Section 8.4 - Voltage drop

NC-2009 EAp2:Minimum Energy Performance
posted by  Ali Helmy  on 

We are working on the LEED certification for a hospital building with 10 floors height.

5
Electrical Engineer
DAR Al-Handasah
LEEDuser Basic Member
0 thumbs up
Mon Jan 13, 2014, 1:50 pm

Default fixture usage - showers in a swimming pool facility

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Ricardo Sá  on 

In a swimming pool facility it is very likely that almost all users do take a shower before leave.

11
Mon Jan 13, 2014, 9:39 am

IEQc8.2 Exemplary Performance

CS-2009 IEQc8.2:Daylight and Views—Views
posted by  Ron Dean  on 

Hi: About the Measure 1: "90% or more of regularly occupied spaces have multiple lines of sight, to vision glazing, in different directions at least 90 degrees apart"...

3
SUMAC Latinoamerica SAC
LEEDuser Basic Member
6 thumbs up
Sun Jan 12, 2014, 2:03 pm

TOTAL MATERIAL COST for PRE-CAST CONCRETE COMPONENTS

NC-2009 MRc4:Recycled Content
posted by  anupam verma  on 

Currently I am working on a project registered under v2.3. My question is related with TOTAL MATERIAL COST for PRE-CAST CONCRETE COMPONENTS in MR credit 4 & 5.

5
Default Avatar
LEEDuser Expert
472 thumbs up
Fri Jan 10, 2014, 11:54 pm

EAc5 Measurement and Verification Option 3

NC-2009 EAc5:Measurement and Verification
posted by  Dan Milewski  on 

Is Option 3 (1 point) - Meet MPR 6 through compliance Opttion 1: Energy and Water Data Release Form. Is option 3 available as a stand alone option or only as a exemplary performance if Options 1

8
Sustainable Building Consultant
Green Bridge Consulting
LEEDuser Expert
28 thumbs up
Fri Jan 10, 2014, 2:29 pm

Private versus public lavs

Healthcare-v2009 WEc3:Water use reduction
posted by  Kim Shinn  on 

In an in-suite setting (imaging, lab, urgent care or even emergency department), we frequently see situations where there are restrooms provided for patient (and staff) use embedded in the diagnost

10
Thu Jan 9, 2014, 11:12 pm

Calculating Concrete

Healthcare-v2009 MRc3:Sustainably sourced materials and products
posted by  Catherine Blakemore  on 

How does concrete get logged on the MRc3 Calculator? Should each component be listed with individual costs for each?

5
Partner, Architecture & Sustainability
DIALOG
LEEDuser Premium Member
449 thumbs up
Thu Jan 9, 2014, 10:41 pm