Forum quick links
Energy source for Reheat
NC-2009 EAp2:Minimum energy performanceposted by Maya Karkour on
Hello, For the baseline building, does the REHEAT energy source for a VAV system need to be identical to the proposed reheat source, or is it as per the main heating source? For example, my propo
Natural ventilation
NC-2009 EAp2:Minimum energy performanceposted by Rosana Correa on
We are working on an industrial building which has 3 hangars which are occupied during working hours and its partly open and 24 hours natural ventilated.
Banking facility
NC-2009 SSc2:Development density and community connectivityposted by Magda Aghababyan on
For one of our projects we are thinking of negotiating with a local bank to set up an ATM machine that is open to public.
Production line with both skylight and artifical lights
EBOM-2009 IEQc2.2:Controllability of systems - lightingposted by Magda Aghababyan on
We have a production line with about 2000 workers that has both a skylight system and an artificial lighting system that only works when the daylight level goes below a specified limit.
Regional Priority points in total points attempted
CS-2009 RPc1:Regional priorityposted by J W on
I have completed 4 points that should also be regional priority points, but I don't see anywhere that 4 points have been added.
Parking topmost floor - excluded from SS7.2?
NC-2009 SSc7.2:Heat island effect - roofposted by Maya Karkour on
Dear All, Our project consists of a retail mall, with an adjacent parking building (same height).
Documenting Rated Power for Gas Appliances
CI-2009 EAc1.4:Optimize energy performance - equipment and appliancesposted by Dana Villeneuve on
Does anyone have experience documenting the rated power of a gas appliance? Are we to only document the electricity usage of gas appliances, or do we account for the gas usage?
LEED boundary and pre-existing parking structure.
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Michelle Oishi on
I've been looking through the forums and documentation and get some conflicting information. We're trying to establish an appropriate LEED project boundary for our project.
LEED AP without speciality
ND-v2009 IDc2:LEED Accredited Professionalposted by David ESPAGNET on
Dear Sir Or Madam, Can one of you confirm me if a LEED AP without speciality is eligible for this credit? Many thanks in advance
IEQc3.3 LEED EBOM 2009
EBOM-2009 IEQc3.3:Green cleaning - purchase of sustainable cleaning products and materialsposted by Teresa Farmer on
Do I need to submit the product purchase tracking sheet when submitting for this credit?